Quantitative Transmission-System-Reliability Assessment

被引:6
作者
Chowdhury, Ali Asraf [1 ]
Koval, Don O. [2 ]
机构
[1] Calif Independent Syst Operator, Folsom, CA 95630 USA
[2] Univ Alberta, Dept Elect & Comp Engn, Edmonton, AB T6G 2V4, Canada
关键词
Industrial and commercial customers; probabilistic criteria; reliability performance indexes; reliability techniques; transmission-system planning; INTERRUPTION COSTS; CRITERIA;
D O I
10.1109/TIA.2009.2036505
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Quantitative transmission-system reliability is a prerequisite in transmission-system planning and operation supplying industrial and commercial customer loads. A utility industry traditionally has relied on a set of deterministic criteria such as the widely used N - 1 criterion to guide transmission planning supplying all customer types, e.g., residential, agricultural, commercial, industrial, and sensitive high-tech electronic customers. The conventional deterministic planning criteria are based on the system planner's experience and intuition which are lacking a formal and consistent framework for their development. Although easy to use and understand, due to inherent limitations, the deterministic criteria cannot realistically model the probabilistic nature of power-system behavior. Moreover, the application of deterministic criteria possesses the inherent risk of over/under investment in transmission-system-facility additions to meet the system load growth. Over the past two decades, different quantitative transmission-system-reliability techniques have been developed to accurately reflect the stochastic nature of a power-system behavior and assess its reliability performance. This paper illustrates applications of reliability models used to compute the reliability performance of a practical transmission system supplying industrial, commercial, and other customer types.
引用
收藏
页码:304 / 312
页数:9
相关论文
共 13 条
[1]  
ALLAN RN, 90EH03111PWR IEEE
[2]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[3]  
BILLINTON R, 1984, CEA T, V23, P1
[4]   Value-based power system reliability planning [J].
Chowdhury, AA ;
Koval, DO .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1999, 35 (02) :305-311
[5]   Application of customer interruption costs in transmission network reliability planning [J].
Chowdhury, AA ;
Koval, DO .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2001, 37 (06) :1590-1596
[6]  
*EQ REL INF SYST C, 2002, 2001 GEN EQ STAT ANN
[7]  
*EQ REL INF SYST C, 1997, FORC OUT PERF TRANSM
[8]  
HEISING CR, 1994, P CIGRE C PAR FRANC, P274
[9]  
*MAPP CSRWG, 2001, MAPP BULK TRANSM SYS
[10]  
RINGLEE RJ, 1994, IEEE T POWER SYST, V9, P181, DOI 10.1109/59.317611