Optimization of China's provincial renewable energy installation plan for the 13th five-year plan based on renewable portfolio standards

被引:83
作者
Fan, Jing-Li [1 ,2 ,3 ]
Wang, Jia-Xing [1 ]
Hu, Jia-Wei [1 ]
Wang, Yu [4 ]
Zhang, Xian [5 ]
机构
[1] China Univ Min & Technol, Ctr Sustainable Dev & Energy Policy Res SDEP, Sch Energy & Min Engn, Beijing CUMTB, Beijing 100083, Peoples R China
[2] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Beijing 100083, Peoples R China
[3] Beijing Inst Technol CEEP BIT, Ctr Energy & Environm Policy Res, Beijing 100081, Peoples R China
[4] Tsinghua Univ, Inst Energy Environm & Econ, Beijing 100084, Peoples R China
[5] Minist Sci & Technol, Adm Ctr Chinas Agenda 21, Beijing 100038, Peoples R China
基金
中国国家自然科学基金;
关键词
Renewable energy; Installation planning; Renewable portfolio standard; POWER-SYSTEM; HIGH PENETRATION; GENERATION; COST; MODEL; MULTIPERIOD; DEMAND; TRANSMISSION; FLEXIBILITY; UNCERTAINTY;
D O I
10.1016/j.apenergy.2019.113757
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Renewable energy (RE) in China has developed rapidly in recent years. Due to an overly aggressive RE installation plan, the country now faces the issue of RE power curtailment. Based on the newly proposed provincial renewable portfolio standards for 2020, an integrated planning model composed of a multi-regression model and linear planning model was established to optimize the RE power installation plan for each province in 2020. The results show that after optimization using the integrated model, nearly 400 TWh of excess RE power (including about 300 TWh of non-hydropower) will be saved. Guangdong, Shanghai, and Jiangsu are the main hydropower transfer provinces, whereas Beijing, Tianjin, Henan, Zhejiang, and Jiangsu are the principal non-hydropower transfer provinces. The research results also show that the newly installed capacity of RE resource-rich areas such as Sichuan, Yunnan, Inner Mongolia, and Xinjiang will account for less than 20% of the existing installed capacity according to China's current plan. In the future, these provinces must make full use of the power generation capacities of existing installed RE sources. The optimization of RE resource allocation is promoted in this study through the inter-provincial allocation of RE power and the combination of the renewable portfolio standards and the green certificate trading system.
引用
收藏
页数:16
相关论文
共 57 条
[1]   An integrated framework for operational flexibility assessment in multi-period power system planning with renewable energy production [J].
Abdin, Adam F. ;
Zio, Enrico .
APPLIED ENERGY, 2018, 222 :898-914
[2]  
[Anonymous], GUID OP IMPL 13 5 YE
[3]  
[Anonymous], CLIM STRAT TARG
[4]  
[Anonymous], 2010, TECHNO EC EVALUATION
[5]  
[Anonymous], 2018, Renewables 2018 Global Status Report
[6]  
[Anonymous], 11 5 YEAR PLAN REN E
[7]  
[Anonymous], 2019, BP STAT REV WORLD EN
[8]  
[Anonymous], 2018, NAT MON REP DEV REN
[9]  
[Anonymous], REN EN DAT HDB
[10]   Identification of optimal strategies for energy management systems planning under multiple uncertainties [J].
Cai, Y. P. ;
Huang, G. H. ;
Yang, Z. F. ;
Tan, Q. .
APPLIED ENERGY, 2009, 86 (04) :480-495