Facing energy-aware scheduling: a multi-objective extension of a scheduling support system for improving energy efficiency in a moulding industry

被引:25
作者
Paolucci, Massimo [1 ]
Anghinolfi, Davide [1 ]
Tonelli, Flavio [2 ]
机构
[1] Univ Genoa, Dept Informat Bioengn Robot & Syst Engn, Genoa, Italy
[2] Univ Genoa, Dept Mech Engn Energy Management & Transports, Genoa, Italy
关键词
Scheduling; Energy efficiency; Metaheuristics; Injection moulding; POWER-CONSUMPTION;
D O I
10.1007/s00500-015-1987-8
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Nowadays most industries do not integrate product, process and energy data. Costs due to energy consumption are often considered externalities and energy efficiency is not deemed a relevant performance criterion. In energy-intensive processes, as injection moulding, the specific energy consumption, embedded inside the same products, depends on the machine-product combinations. Multi-objective scheduling, including the energy data acquired from shop floor and allocation criteria, is a valuable approach to improve energy efficiency. This paper presents the extension of a commercial detailed scheduling support system developed within a regional Italian project aiming at providing tools to manufacturing industry for improving energy efficiency. The project designed a monitoring system developed by instrumenting injection moulding presses to acquire the energy consumption for each product-machine combination. The commercial scheduling system was extended by implementing a multi-objective metaheuristic scheduling approach. The experimental assessment of the proposed approach involved a major producer of plastic dispensers. The extended algorithm simultaneously optimizes the total weighted tardiness, the total setup and the energy consumption costs. The obtained results, produced for a real test case and a set of random generated instances, show the effectiveness of the proposed approach.
引用
收藏
页码:3687 / 3698
页数:12
相关论文
共 34 条
  • [1] Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops
    Bruzzone, A. A. G.
    Anghinolfi, D.
    Paolucci, M.
    Tonelli, F.
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2012, 61 (01) : 459 - 462
  • [2] Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm
    Dai, Min
    Tang, Dunbing
    Giret, Adriana
    Salido, Miguel A.
    Li, W. D.
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2013, 29 (05) : 418 - 429
  • [3] Industrial ecology at factory level - a conceptual model
    Despeisse, M.
    Ball, P. D.
    Evans, S.
    Levers, A.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2012, 31 : 30 - 39
  • [4] A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    Fang, Kan
    Uhan, Nelson
    Zhao, Fu
    Sutherland, John W.
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2011, 30 (04) : 234 - 240
  • [5] Gutowski T., 2006, ELECT ENERGY REQUIRE, P623
  • [6] Generating experimental data for computational testing with machine scheduling applications
    Hall, NG
    Posner, ME
    [J]. OPERATIONS RESEARCH, 2001, 49 (06) : 854 - 865
  • [7] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    He, Y
    Liu, F
    Cao, HJ
    Li, CB
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2005, 12 (2): : 167 - 171
  • [8] Hoogeveen H, 2005, EUR J OPER RES, V167, P592, DOI 10.1016/j.ejor.2004.07.011
  • [9] The incoming global technological and industrial revolution towards competitive sustainable manufacturing
    Jovane, F.
    Yoshikawa, H.
    Alting, L.
    Boer, C. R.
    Westkamper, E.
    Williams, D.
    Tseng, M.
    Seliger, G.
    Paci, A. M.
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2008, 57 (02) : 641 - 659
  • [10] Barriers to increasing energy efficiency: evidence from small-and medium-sized enterprises in China
    Kostka, Genia
    Moslener, Ulf
    Andreas, Jan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2013, 57 : 59 - 68