Robotics and automated systems in construction: Understanding industry-specific challenges for adoption

被引:327
作者
Delgado, Juan Manuel Davila [1 ]
Oyedele, Lukumon [1 ]
Ajayi, Anuoluwapo [1 ]
Akanbi, Lukman [1 ]
Akinade, Olugbenga [1 ]
Bilal, Muhammad [1 ]
Owolabi, Hakeem [1 ]
机构
[1] Univ West England UWE Bristol, Fac Business & Law, Big Data Enterprise & Artificial Intelligence Lab, Coldharbour Lane, Bristol BS16 1QY, Avon, England
基金
“创新英国”项目; 英国工程与自然科学研究理事会;
关键词
Automated construction; Robotics; Additive manufacturing; Exoskeletons; Autonomous vehicles; Off-site construction; OPPORTUNITIES; EXOSKELETONS; PRODUCTIVITY; FABRICATION; TECHNOLOGY; INNOVATION; BARRIERS; DRIVERS; DRONE;
D O I
10.1016/j.jobe.2019.100868
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is a major economic sector, but it is plagued with inefficiencies and low productivity. Robotics and automated systems have the potential to address these shortcomings; however, the level of adoption in the construction industry is very low. This paper presents an investigation into the industry-specific factors that limit the adoption in the construction industry. A mixed research method was employed combining literature review, qualitative and quantitative data collection and analysis. Three focus groups with 28 experts and an online questionnaire were conducted. Principal component and correlation analyses were conducted to group the identified factors and find hidden correlations. The main identified challenges were grouped into four categories and ranked in order of importance: contractor-side economic factors, client-side economic factors, technical and work-culture factors, and weak business case factors. No strong correlation was found among factors. This study will help stakeholders to understand the main industry-specific factors limiting the adoption of robotics and automated systems in the construction industry. The presented findings will support stakeholders to devise mitigation strategies.
引用
收藏
页数:11
相关论文
共 94 条
[51]   A survey of current status of and perceived changes required for BIM adoption in the UK [J].
Eadie, Robert ;
Browne, Mike ;
Odeyinka, Henry ;
McKeown, Clare ;
McNiff, Sean .
BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2015, 5 (01) :4-21
[52]   Achieving Integration in Mixed Methods Designs-Principles and Practices [J].
Fetters, Michael D. ;
Curry, Leslie A. ;
Creswell, John W. .
HEALTH SERVICES RESEARCH, 2013, 48 (06) :2134-2156
[53]  
Forbes L.H., 2011, Modern Construction: Lean Project Delivery and Integrated Practices
[54]   Robotics for Self-Organised Construction [J].
Gerling, Victor ;
von Mammen, Sebastian .
2016 IEEE 1ST INTERNATIONAL WORKSHOPS ON FOUNDATIONS AND APPLICATIONS OF SELF* SYSTEMS (FAS*W), 2016, :162-167
[55]   Feasibility study for drone-based masonry construction of real-scale structures [J].
Goessens, Sebastien ;
Mueller, Caitlin ;
Latteur, Pierre .
AUTOMATION IN CONSTRUCTION, 2018, 94 :458-480
[56]   Wearable Upper Limb Exoskeletons: Generations, Design Challenges and Task Oriented Synthesis [J].
Gupta, Sakshi ;
Agrawal, Anupam ;
Singla, Ekta .
NEW TRENDS IN MEDICAL AND SERVICE ROBOTICS: ADVANCES IN THEORY AND PRACTICE, 2019, 65 :134-142
[57]  
Hair JF, 2014, Multivariate data analysis: A global perspective, DOI DOI 10.1002/9781119409137.CH4
[58]   FACTORY AUTOMATION - THE JAPANESE EXPERIENCE [J].
HUANG, PY ;
SAKURAI, M .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1990, 37 (02) :102-108
[59]   The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector [J].
Jaillon, Lara ;
Poon, C. S. .
AUTOMATION IN CONSTRUCTION, 2009, 18 (03) :239-248
[60]  
Jayaraj A., 2018, IOP Conference Series: Materials Science and Engineering, V376, DOI 10.1088/1757-899X/376/1/012114