共 50 条
- [1] The Investment Estimation Method of Mine Construction Project Based on BP Neural Network 2009 GEOLOGY RESOURCE MANAGEMENT AND SUSTAINABLE DEVELOPMENT, 2009, : 252 - 256
- [2] Study of the Safety Assessment Model of Coal Mine Based on BP Neural Network ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL I, PROCEEDINGS, 2009, : 103 - 106
- [3] The Model of Project Risk Assessment Based on BP Neural Network Algorithm 2013 3RD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2013, : 326 - 329
- [4] MAJOR PROJECT RISK ASSESSMENT METHOD BASED ON BP NEURAL NETWORK DISCRETE AND CONTINUOUS DYNAMICAL SYSTEMS-SERIES S, 2019, 12 (4-5): : 1053 - 1064
- [5] The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2304 - +
- [6] Determination of Coal Mine Safety Risk System Indicator Weight Based on BP Neural Network PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 239 - 244
- [7] Study on the Risk Assessment of Real Estate Project Based on BP Neural Network 2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 535 - 537
- [8] Study on Evaluation of Coal Mine Safety Based on BP Neural Network EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 3313 - 3316
- [9] The evaluation for the behavioral risk of principal participants in construction project based on BP neural network Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 97 - 107
- [10] Forecasting construction project cost based on BP neural network 2018 10TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA), 2018, : 420 - 423