Resource allocation model in cloud manufacturing

被引:32
作者
Wang, Shi-long [1 ]
Zhu, Zhe-qi [1 ]
Kang, Ling [1 ]
机构
[1] Chongqing Univ, State Key Lab Mech Transmiss, 309 Room,7 Teaching Bldg, Chongqing, Peoples R China
关键词
Cloud manufacturing; resources evaluation mechanism; resources organization structure; resources scheduling strategy; SSFLA;
D O I
10.1177/0954406215582016
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Allocation of resources in cloud manufacturing is one of the key points of cloud manufacturing technology. To optimize cloud manufacturing resource management, it is indispensable to improve the process and efficiency of scheduling by matching jobs with resources according to the size of the job and establishing a four-level structure for resources based on the enterprise level, workshop level, primitive cell and service level. A resource scheduling model containing four indicators of cost, time, quality and risk with their own mathematical expressions is proposed. We also simulate the model with a new swap-shuffled leap-frog algorithm (SSFLA). Finally, we test the algorithm with different example scales and different end conditions and compare it with particle swarm optimization (PSO) and genetic algorithm (GA). The result shows that SSFLA performs well in convergence speed and robustness and does much better than PSO and GA. This algorithm provides an alternative choice for allocation of resources in cloud manufacturing model.
引用
收藏
页码:1726 / 1741
页数:16
相关论文
共 42 条
[11]  
Korhonen J., 2004, PROGR IND ECOLOGY, V1, P61, DOI DOI 10.1504/PIE.2004.004672
[12]   Benchmarking and comparison of the task graph scheduling algorithms [J].
Kwok, YK ;
Ahmad, I .
JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 1999, 59 (03) :381-422
[13]  
Lartigau J., 2012, 2012 International Joint Conference on Service Sciences (IJCSS 2012), P34, DOI 10.1109/IJCSS.2012.19
[14]  
Lawrence Associates Inc, 1994, VIRT MAN US WORKSH D, P12
[15]  
Leung J.Y.-T., 2005, MULTIDISCIPLINARY SC, P37
[16]  
Li B. H., 2010, ZTE TECHNOL J, V16, P5
[17]  
Li Bo-hu, 2011, Computer Integrated Manufacturing Systems, V17, P449
[18]  
Li Bo-hu, 2010, Computer Integrated Manufacturing Systems, V16, P1
[19]   Solving the blocking flow shop scheduling problem by a dynamic multi-swarm particle swarm optimizer [J].
Liang, J. J. ;
Pan, Quan-Ke ;
Chen Tiejun ;
Wang, Ling .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 55 (5-8) :755-762
[20]  
Mohammad AD, 2009, INT J ADV MANUF TECH, V45, P199