Bicriteria Scheduling Problem on the Two-Machine Flowshop Using Simulated Annealing

被引:0
|
作者
Mesgarpour, Mohammad [1 ]
Kirkavak, Nureddin [2 ]
Ozaktas, Hakan [3 ]
机构
[1] Univ Southampton, Sch Math, Southampton SO17 1BJ, Hants, England
[2] Eastern Mediterranean Univ, Dept Ind Engn, Famagusta 10, Turkey
[3] Atilim Univ, Dept Ind Engn, TR-06836 Ankara, Turkey
来源
EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS | 2010年 / 6022卷
关键词
Bicriteria Scheduling; Flowshop Scheduling; Simulated Annealing; ALGORITHM; MACHINE; OPTIMIZATION; COMPLEXITY; SHOP;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Real life scheduling problems require the decision maker to consider a number of criteria before arriving at any decision. The trade-offs involved in considering several different criteria provide useful insights for the decision maker. Surprisingly, research in the field of multi-objective scheduling has been quite limited when compared to research in single criterion scheduling. The subject of this paper is the bicriteria scheduling problem in a two-machine flowshop. The objective is to find a job sequence that minimizes sum of weighted total flowtime and total tardiness. Based on the problem characteristics, a Simulated Annealing algorithm is developed. The proposed meta-heuristic is compared with the branch and bound enumeration algorithm of the integer programming model as well as a modified version of the well-known NEH algorithm. During these evaluations, the experimental design approach and careful statistical analysis have been used to validate the effectiveness of the simulated annealing approach.
引用
收藏
页码:166 / +
页数:3
相关论文
共 50 条
  • [41] A Branch and Bound Algorithm for the Two-Machine Blocking Flowshop Group Scheduling Problem
    Zhang, Sen
    Qian, Bin
    Hu, Rong
    Zhang, Changsheng
    Li, Kun
    ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, ICIC 2023, PT I, 2023, 14086 : 322 - 332
  • [42] Two-machine flowshop scheduling to minimize total tardiness
    Pan, JCH
    Fan, ET
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1997, 28 (04) : 405 - 414
  • [43] A Two-Machine Flowshop Scheduling Problem with a Job Precedence Constraint to Minimize the Total Completion Time
    Xu, Jianyou
    Lin, Win-Chin
    Yin, Yunqiang
    Cheng, Yu
    Wu, Chin-Chia
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2017, 76 (12): : 761 - 766
  • [44] Two-machine flowshop scheduling with consecutive availability constraints
    Cheng, TCE
    Wang, GQ
    INFORMATION PROCESSING LETTERS, 1999, 71 (02) : 49 - 54
  • [45] A two machine bicriteria scheduling problem
    Sarin, SC
    Hariharan, R
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 65 (02) : 125 - 139
  • [46] An improved two-machine flowshop scheduling with intermediate transportation
    Jianming Dong
    Xueshi Wang
    Jueliang Hu
    Guohui Lin
    Journal of Combinatorial Optimization, 2016, 31 : 1316 - 1334
  • [47] Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
    Allahverdi, Ali
    Aydilek, Harun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (21) : 6367 - 6385
  • [48] A Truncated Sum of Processing-Times-Based Learning Model for a Two-Machine Flowshop Scheduling Problem
    Lai, Kunjung
    Hsu, Peng-Hsiang
    Ting, Ping-Ho
    Wu, Chin-Chia
    HUMAN FACTORS AND ERGONOMICS IN MANUFACTURING & SERVICE INDUSTRIES, 2014, 24 (02) : 152 - 160
  • [49] Note: On the two-machine no-idle flowshop problem
    Cepek, O
    Okada, M
    Vlach, M
    NAVAL RESEARCH LOGISTICS, 2000, 47 (04) : 353 - 358
  • [50] A bicriteria flowshop scheduling problem with setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 183 (02) : 1292 - 1300