Bicriteria Scheduling Problem on the Two-Machine Flowshop Using Simulated Annealing

被引:0
|
作者
Mesgarpour, Mohammad [1 ]
Kirkavak, Nureddin [2 ]
Ozaktas, Hakan [3 ]
机构
[1] Univ Southampton, Sch Math, Southampton SO17 1BJ, Hants, England
[2] Eastern Mediterranean Univ, Dept Ind Engn, Famagusta 10, Turkey
[3] Atilim Univ, Dept Ind Engn, TR-06836 Ankara, Turkey
来源
EVOLUTIONARY COMPUTATION IN COMBINATORIAL OPTIMIZATION, PROCEEDINGS | 2010年 / 6022卷
关键词
Bicriteria Scheduling; Flowshop Scheduling; Simulated Annealing; ALGORITHM; MACHINE; OPTIMIZATION; COMPLEXITY; SHOP;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Real life scheduling problems require the decision maker to consider a number of criteria before arriving at any decision. The trade-offs involved in considering several different criteria provide useful insights for the decision maker. Surprisingly, research in the field of multi-objective scheduling has been quite limited when compared to research in single criterion scheduling. The subject of this paper is the bicriteria scheduling problem in a two-machine flowshop. The objective is to find a job sequence that minimizes sum of weighted total flowtime and total tardiness. Based on the problem characteristics, a Simulated Annealing algorithm is developed. The proposed meta-heuristic is compared with the branch and bound enumeration algorithm of the integer programming model as well as a modified version of the well-known NEH algorithm. During these evaluations, the experimental design approach and careful statistical analysis have been used to validate the effectiveness of the simulated annealing approach.
引用
收藏
页码:166 / +
页数:3
相关论文
共 50 条
  • [21] A two-machine flowshop scheduling problem with precedence constraint on two jobs
    Cheng, Shuenn-Ren
    Yin, Yunqiang
    Wen, Chih-Hou
    Lin, Win-Chin
    Wu, Chin-Chia
    Liu, Jun
    SOFT COMPUTING, 2017, 21 (08) : 2091 - 2103
  • [22] A two-machine flowshop scheduling problem with a separated maintenance constraint
    Yang, Dar-Li
    Hsu, Chou-Jung
    Kuo, Wen-Hung
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) : 876 - 883
  • [23] Solving the flowshop scheduling problem using simulated annealing
    Yang, G. (yanggelan@126.com), 1600, Advanced Institute of Convergence Information Technology, Myoungbo Bldg 3F,, Bumin-dong 1-ga, Seo-gu, Busan, 602-816, Korea, Republic of (04): : 575 - 582
  • [24] Two-machine flowshop scheduling in a physical examination center
    Wang, Yadong
    Fan, Baoqiang
    Zhai, Jingang
    Xiong, Wei
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 37 (01) : 363 - 374
  • [25] A greedy heuristic and simulated annealing approach for a bicriteria flowshop scheduling problem with precedence constraints—a practical manufacturing case
    Samer Hanoun
    Saeid Nahavandi
    The International Journal of Advanced Manufacturing Technology, 2012, 60 : 1087 - 1098
  • [26] Two-machine flowshop scheduling in a physical examination center
    Yadong Wang
    Baoqiang Fan
    Jingang Zhai
    Wei Xiong
    Journal of Combinatorial Optimization, 2019, 37 : 363 - 374
  • [27] Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine
    Lee, Ju-Yong
    Kim, Yeong-Dae
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 : 22 - 30
  • [29] Two-machine flowshop scheduling with fuzzy processing times and flexible operations
    Uruk, Zeynep
    Yalciner, Ayten Yilmaz
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (01) : 100 - 119
  • [30] A Simulated Annealing Approach to Bicriteria Scheduling Problems on a Single Machine
    Esra Köktener Karasakal
    Murat Köksalan
    Journal of Heuristics, 2000, 6 : 311 - 327