Single-machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs

被引:39
作者
Ahmadizar, Fardin [1 ]
Farhadi, Soma [1 ]
机构
[1] Univ Kurdistan, Dept Ind Engn, Sanandaj, Iran
关键词
Scheduling; Single-machine; Batch delivery; Release dates; Due windows; Dominance properties; Imperialist competitive algorithm; IMPERIALIST COMPETITIVE ALGORITHM; GENETIC ALGORITHM; PENALTIES; COMMON; TIMES;
D O I
10.1016/j.cor.2014.08.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with a single-machine scheduling problem in which jobs are released in different points in time but delivered to customers in batches. A due window is associated with each job. The objective is to schedule the jobs, to form them into batches and to decide the delivery date of each batch so as to minimize the sum of earliness, tardiness, holding, and delivery costs. A mathematical model of the problem is presented, and a set of dominance properties is established. To solve this NP-hard problem efficiently, a solution method is then proposed by incorporating the dominance properties with an imperialist competitive algorithm. Unforced idleness and forming discontinuous batches are allowed in the proposed algorithm. Moreover, the delivery date of a batch may be decided to be later than the completion time of the last job in the batch. Finally, computational experiments are conducted to evaluate the proposed model and solution procedure, and results are discussed. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:194 / 205
页数:12
相关论文
共 25 条