共 50 条
[32]
Comprehensive assessment of cable-stayed bridge based on Pagerank algorithm
[J].
ADVANCES IN BRIDGE ENGINEERING,
2023, 4 (01)
[33]
FATIGUE LIFE EVALUATION OF RION - ANTIRION CABLE-STAYED BRIDGE USING THE MULTISCALING FRACTURE MECHANICS APPROACH
[J].
INTERNATIONAL JOURNAL OF BRIDGE ENGINEERING,
2015, 3 (02)
:25-36
[36]
SEISMIC BEHAVIOR OF A DUAL-DECK CABLE-STAYED BRIDGE WITH INVERTED-Y TOWERS
[J].
IRF2016: 5TH INTERNATIONAL CONFERENCE INTEGRITY-RELIABILITY-FAILURE,
2016,
:1443-1450
[37]
Research on Reasonable Construction Plan for Cast-in-Place UHPC Bridge Deck Plate of Cable-Stayed Bridge
[J].
APPLIED SCIENCES-BASEL,
2023, 13 (15)
[38]
Cantilever Construction Optimization of Cable-stayed Bridge with Hybrid Bridge Deck System and Building Materials in Civil Engineering
[J].
ADVANCED RESEARCH ON CIVIL ENGINEERING AND MATERIAL ENGINEERING,
2012, 568
:107-+
[39]
Health Monitoring-Based Assessment of Reinforcement with Prestressed Steel Strand for Cable-Stayed Bridge
[J].
SDHM Structural Durability and Health Monitoring,
2022, 16 (01)
:53-80