Widening of the Cable-Stayed Bridge Over the Rande Strait in Spain

被引:5
作者
Serrano-Corral, Alvaro [1 ]
Ruperez-Astarloa, Miguel [1 ]
Carlos Alonso-Lopez, Juan [1 ]
Rodriguez-Munoz, David [1 ]
机构
[1] MC2 Estudio Ingn TYPSA Grp, Madrid, Spain
关键词
bridge widening; cable-stayed bridge; long span; wind tunnel; erection process;
D O I
10.1080/10168664.2019.1649100
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Atlantic Motorway, AP-9, crosses the Vigo estuary in Spain by means of a 400 m span cable-stayed bridge with a composite deck over the Rande Strait. This bridge was built between 1973 and 1977, and opened to traffic in 1981. In 2006, the average daily traffic reached 55 000 vehicles, close to its effective capacity, and therefore resulted in frequent traffic congestion conditions. To increase the bridge's traffic capacity, feasibility studies were carried out. After technical, aesthetic and economic comparative analyses, the most favourable solution found was a widening project. The widening solution consists of two new external composite decks positioned along both the outer sides of the existing deck next to the main piers. This system, a worldwide pioneer, will allow bridge-widening works without either interrupting the traffic on the existing bridge or affecting the Vigo estuary, a very valuable zone from a natural environmental and landscape perspective.
引用
收藏
页码:547 / 550
页数:4
相关论文
共 5 条
  • [1] Widening of the cable-stayed bridge over the Rande Strait, Spain
    Calzón, Julio Martínez
    Vilardell, Manuel Juliá
    Corral, Serrano
    Navarro, Miguel Gómez
    [J]. Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2008, 18 (04): : 314 - 317
  • [2] De Miranda F, 1979, COSTRUZIONI METALLIC, V2, P55
  • [3] Del Pozo F., 1978, REV OBRAS PUBLICAS, V3162, P727
  • [4] del Pozo Frutos FJ., 1979, HORMIGON ACERO, V30, P385
  • [5] Ministerio de Fomento, 2011, INSTR ACC CONS PROYE