Investigating reliability improvement of second-hand production equipment considering warranty and preventive maintenance strategies

被引:36
作者
Darghouth, Mohamed Noomane [1 ,4 ]
Chelbi, Anis [2 ,4 ]
Ait-kadi, Daoud [3 ,4 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Syst Engn, Dhahran, Saudi Arabia
[2] Univ Tunis, Ctr Rech Prod CEREP, Ecole Natl Super Ingn Tunis, Tunis, Tunisia
[3] Laval Univ, Dept Mech Engn, Quebec City, PQ, Canada
[4] Interuniv Res Ctr Enterprise Networks Logist & Tr, Montreal, PQ, Canada
关键词
reliability improvement; second-hand product; production equipment; warranty; preventive maintenance; cost model; AGE-REPLACEMENT POLICY; UPGRADE LEVEL; COST-ANALYSIS; MANAGEMENT; PRICE; MODEL;
D O I
10.1080/00207543.2016.1277277
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A cost model for optimal reliability improvement of warranted second-hand production equipment is developed. The second-hand production equipment of age x is subjected to an upgrade action of a certain level u before it is sold with a Free Repair Warranty. We look at determining the optimal upgrade level when not performing and when performing periodic preventive maintenance (PM) during the warranty period. Two different PM strategies are considered: (a) periodic PM actions having the same efficiency level; (b) periodic multi-phase PM actions with a maintenance efficiency level which varies according to the phase. The proposed model aims at helping the dealer to find the optimal upgrade level to perform before selling the second-hand equipment, and to assess whether performing PM actions during the warranty period, according to a specific maintenance strategy, is worthwhile in terms of cost reduction. Numerical experimentations considering each PM scenario are performed in order to investigate how each PM strategy impacts the improvement level to be performed and the associated total expected cost. The obtained results showed that the expected total cost incurred by the dealer is governed by a sensitive trade-off between the warranty servicing cost and the costs associated with the reliability improvement, and with the PM performed during the warranty period. It is also found that the proposed new periodic multi-phase PM policy with an increasing maintenance efficiency level yields lower upgrade levels, inducing lower costs for the dealer.
引用
收藏
页码:4643 / 4661
页数:19
相关论文
共 40 条
[1]   PRODUCT WARRANTY MANAGEMENT .1. A TAXONOMY FOR WARRANTY POLICIES [J].
BLISCHKE, WR ;
MURTHY, DNP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 62 (02) :127-148
[2]   A decision model for adopting an extended warranty under different maintenance policies [J].
Bouguerra, Soumaya ;
Chelbi, Anis ;
Rezg, Nidhal .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (02) :840-849
[3]  
Chattopadhyay G., 2001, International Transactions in Operational Research, V8, P47, DOI 10.1111/1475-3995.00005
[4]  
Chattopadhyay G., 2004, International Journal of Reliability and Applications, V5, P47
[5]  
Chattopadhyay G., 1996, AUSTR JAPAN WORKSHOP, V2, P91
[6]   Warranty cost analysis for second-hand products [J].
Chattopadhyay, GN ;
Murthy, DNP .
MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (10-12) :81-88
[7]   Optimal age-replacement policy under an imperfect renewing free-replacement warranty [J].
Chien, Yu-Hung .
IEEE TRANSACTIONS ON RELIABILITY, 2008, 57 (01) :125-133
[8]   The Effect of a Pro-Rata Rebate Warranty on the Age Replacement Policy With Salvage Value Consideration [J].
Chien, Yu-Hung .
IEEE TRANSACTIONS ON RELIABILITY, 2010, 59 (02) :383-392
[9]   Warranty analysis: An approach to modeling imperfect repairs [J].
Chukova, S ;
Arnold, R ;
Wang, DQ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 89 (01) :57-68
[10]  
CHUN YH, 1992, MICROELECTRON RELIAB, V32, P839, DOI DOI 10.1016/0026-2714(92)90050-U