Sustainability in a lot-sizing and scheduling problem with delivery time window and sequence-dependent setup cost consideration

被引:15
作者
Vaez, Parinaz [1 ]
Sabouhi, Fatemeh [2 ]
Jabalameli, Mohammad Saeed [2 ]
机构
[1] Isfahan Univ Technol, Sch Ind Engn, Esfahan, Iran
[2] Iran Univ Sci & Technol, Sch Ind Engn, Tehran, Iran
关键词
Lot-sizing and scheduling; Delivery time window; Earliness/tardiness; Sustainability; EPSILON-CONSTRAINT METHOD; WASTE MANAGEMENT; CARBON FOOTPRINT; SUPPLY CHAIN; DESIGN; MODEL; OPTIMIZATION; TARDINESS; ALGORITHM; RESILIENT;
D O I
10.1016/j.scs.2019.101718
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Sustainability in manufacturing operations scheduling is a necessary requirement for companies. Although this subject has attracted much attention, joint decisions of lot-sizing and scheduling with sustainability consideration have not been completely examined in the literature. In this regard, we aim to present a bi-objective model to solve a lot-sizing and scheduling problem simultaneously that would maximize the total profit and minimize CO2 emissions. Also, an augmented epsilon-constraint method is utilized to transform the model into a single-objective formulation. The proposed model considers Earliness/Tardiness penalties with the delivery time window and sequence-dependent setup costs. Moreover, the model is implemented in a case study of steel company and practical conclusions and managerial insights are reported. Results show that the proposed model is useful for production managers in order to schedule their operations.
引用
收藏
页数:9
相关论文
共 52 条
[1]   Evaluating the effects of environmental regulations on a closed-loop supply chain network: a variational inequality approach [J].
Allevi, E. ;
Gnudi, A. ;
Konnov, I. V. ;
Oggioni, G. .
ANNALS OF OPERATIONS RESEARCH, 2018, 261 (1-2) :1-43
[2]   A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times [J].
Almada-Lobo, Bernardo ;
Oliveira, Jose F. ;
Carravilla, Maria Antonia .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) :1374-1376
[3]   Single machine multi-product capacitated lot sizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
Klabjan, Diego ;
Carravilla, Maria Antonia ;
Oliveira, Jose F. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (20) :4873-4894
[4]   Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
James, Ross J. W. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (03) :861-878
[5]   Joint decisions of machining process parameters setting and lot-size determination with environmental and quality cost consideration [J].
Awad, Mahmoud I. ;
Hassan, Noha M. .
JOURNAL OF MANUFACTURING SYSTEMS, 2018, 46 :79-92
[6]   A GLNPSO for multi-level capacitated lot-sizing and scheduling problem in the poultry industry [J].
Boonmee, Atiwat ;
Sethanan, Kanchana .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 250 (02) :652-665
[7]   Solving discrete lot-sizing and scheduling by simulated annealing and mixed integer programming [J].
Ceschia, Sara ;
Di Gaspero, Luca ;
Schaerf, Andrea .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 114 :235-243
[8]   Carbon-efficient scheduling of flow shops by multi-objective optimization [J].
Ding, Jian-Ya ;
Song, Shiji ;
Wu, Cheng .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 248 (03) :758-771
[9]   Investigation on a novel sustainable model for waste management in megacities: A case study in tehran municipality [J].
Edalatpour, M. A. ;
Al-e-Hashem, S. M. J. Mirzapour ;
Karimi, B. ;
Bahli, B. .
SUSTAINABLE CITIES AND SOCIETY, 2018, 36 :286-301
[10]   Simultaneous lot sizing and scheduling for multi-product multi-level production [J].
Fandel, Guenter ;
Stammen-Hegene, Cathrin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) :308-316