Methodological and On-Site Applied Construction Layout Plan with Batter Boards Stake-Out Methods Comparison: A Case Study of Romania

被引:10
作者
Sestras, Paul [1 ]
机构
[1] Tech Univ Cluj Napoca, Fac Civil Engn, Cluj Napoca 400020, Romania
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 10期
关键词
cadastre; land surveyor; construction surveying; building layout; polar coordinates; stake-out methods; total station; TOTAL STATION; LAND-USE; ACCURACY; GIS; MANAGEMENT; PRECISION; MODEL;
D O I
10.3390/app11104331
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The layout or stake-out is one of the most important assignments of the surveying engineer, and it is of vital importance in the building process, as the designed geometries of the structure ensure the verticality and the correct positioning inside the terrain. The mission of the surveying engineer involves both legal and technical aspects, and the correct planning of the layout process must take into consideration aspects regarding the site conditions, instrumentation used, the required and achievable accuracies, network design and survey methods used. Given the vast applications of geodesy and topography in different domains and industries, the study incorporates general notions and technical aspects regarding the workflow in cadastre and construction surveying, guidelines for an efficient design of site layout plan with on-site applicability, as well as a novel comparison between four methods of construction lines geometry layout on batter boards. The results of this study aim to further consolidate the importance of accurate and efficient construction layout projects, with comprehensive design plans, methods and instrumentation selection, as well as recommendations. The presented discussions and conclusions are of interest to the geodetic community as well as the construction industry, and due to the pragmatic and experimental nature of the research, incorporates technical notes and original results of professional and academic importance.
引用
收藏
页数:19
相关论文
共 33 条
  • [21] Optimisation of site layout planning for multiple construction stages with safety considerations and requirements
    Huang, C.
    Wong, C. K.
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 53 : 58 - 68
  • [22] Jasinka E., 2018, P 18 INT MULT SCI GE, V18, P717
  • [23] Kavanagh BF., 2010, Surveying with construction applications-7th edition
  • [24] Building Information Modelling Feasibility Study for Building Surveying
    Kim, Ki Pyung
    Freda, Rob
    Tan Hai Dang Nguyen
    [J]. SUSTAINABILITY, 2020, 12 (11)
  • [25] Land Use Favourability Assessment Based on Soil Characteristics and Anthropic Pollution. Case Study Somesul Mic Valley Corridor, Romania
    Matei, Ioan
    Pacurar, Ioan
    Rosca, Sanda
    Bilasco, Stefan
    Sestras, Paul
    Rusu, Teodor
    Jude, Eugen Traian
    Taut, Florian Dumitru
    [J]. AGRONOMY-BASEL, 2020, 10 (09):
  • [26] A decision-making system for construction site layout planning
    Ning, Xin
    Lam, Ka-Chi
    Lam, Mike Chun-Kit
    [J]. AUTOMATION IN CONSTRUCTION, 2011, 20 (04) : 459 - 473
  • [27] Schofield W, 2001, Engineering Surveying-Theory and Examination Problems for Students, V5th
  • [28] Geodetic and UAV Monitoring in the Sustainable Management of Shallow Landslides and Erosion of a Susceptible Urban Environment
    Sestras, Paul
    Bilasco, Stefan
    Rosca, Sanda
    Dudic, Branislav
    Hysa, Artan
    Spalevic, Velibor
    [J]. REMOTE SENSING, 2021, 13 (03) : 1 - 29
  • [29] Feasibility Assessments Using Unmanned Aerial Vehicle Technology in Heritage Buildings: Rehabilitation-Restoration, Spatial Analysis and Tourism Potential Analysis
    Sestras, Paul
    Rosca, Sanda
    Bilasco, Stefan
    Nas, Sanda
    Buru, Stefan M.
    Kovacs, Leontina
    Spalevic, Velibor
    Sestras, Adriana F.
    [J]. SENSORS, 2020, 20 (07)
  • [30] Sestras P, 2019, ENVIRON ENG MANAG J, V18, P1269