A case-based reasoning cost estimating model using experience by analytic hierarchy process

被引:129
作者
An, Sung-Hoon
Kim, Gwang-Hee
Kang, Kyung-In
机构
[1] Mokpo Natl Univ, Dept Architectural Engn, Choongnam 534729, South Korea
[2] Korea Univ, Dept Architectural Engn, Seoul 136701, South Korea
关键词
cost estimating; case-based reasoning; analytic hierarchy process; experience;
D O I
10.1016/j.buildenv.2006.06.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A case-based reasoning model is proposed, where experience is included in all processes of construction cost estimating by the analytic hierarchy process. The model overcomes the difficulty of measuring experience for determining the weights of attributes. The accuracy of three different models was compared. The model using the analytic hierarchy process was more accurate, reliable, and explanatory than the other models, and closer to the original aim of the case-based reasoning model, for solving new problems using experience from previous cases. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2573 / 2579
页数:7
相关论文
共 47 条
[31]   Collaborative case-based estimating and design [J].
Perera, S ;
Watson, I .
ADVANCES IN ENGINEERING SOFTWARE, 1998, 29 (10) :801-808
[32]  
Riesbeck C. K., 1989, INSIDE CASE BASED RE
[33]  
Saaty TL., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
[34]   BIDS CONSIDERING MULTIPLE CRITERIA [J].
SEYDEL, J ;
OLSON, DL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :609-623
[35]  
Shen Q., 1998, CONSTR MANAGE EC, V16, P693, DOI DOI 10.1080/014461998371980
[36]   COST MODEL FOR REINFORCED-CONCRETE BEAM AND SLAB STRUCTURES IN BUILDINGS [J].
SINGH, S .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (01) :54-67
[37]   EVALUATION OF ADVANCED CONSTRUCTION TECHNOLOGY WITH AHP METHOD [J].
SKIBNIEWSKI, MJ ;
CHAO, LC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (03) :577-593
[38]  
Skitmore M., 1991, EARLY STAGE CONSTRUC
[39]   Forecast models for actual construction time and cost [J].
Skitmore, RM ;
Ng, ST .
BUILDING AND ENVIRONMENT, 2003, 38 (08) :1075-1083
[40]  
STOTTLER RH, 1994, AI EXPERT, V9, P25