共 47 条
[32]
Riesbeck C. K., 1989, INSIDE CASE BASED RE
[33]
Saaty TL., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
[34]
BIDS CONSIDERING MULTIPLE CRITERIA
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (04)
:609-623
[35]
Shen Q., 1998, CONSTR MANAGE EC, V16, P693, DOI DOI 10.1080/014461998371980
[36]
COST MODEL FOR REINFORCED-CONCRETE BEAM AND SLAB STRUCTURES IN BUILDINGS
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (01)
:54-67
[37]
EVALUATION OF ADVANCED CONSTRUCTION TECHNOLOGY WITH AHP METHOD
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1992, 118 (03)
:577-593
[38]
Skitmore M., 1991, EARLY STAGE CONSTRUC
[39]
Forecast models for actual construction time and cost
[J].
BUILDING AND ENVIRONMENT,
2003, 38 (08)
:1075-1083
[40]
STOTTLER RH, 1994, AI EXPERT, V9, P25