共 50 条
- [1] Least squares support vector machines based predictive feedback scheduling for resource-constrained networks Kongzhi yu Juece/Control and Decision, 2010, 25 (03): : 361 - 366
- [2] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
- [3] Flexible resource-constrained resource leveling project scheduling problem Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
- [4] Intelligent scheduling and optimisation for resource-constrained networks IET CONTROL THEORY AND APPLICATIONS, 2010, 4 (12): : 2982 - 2992
- [6] A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, : 730 - +
- [7] Multimode resource-constrained project scheduling in flexible projects Journal of Global Optimization, 2020, 76 : 211 - 241