Field load tests and numerical analysis of Qingzhou cable-stayed bridge

被引:39
作者
Ren, Wei-Xin [1 ]
Lin, You-Qin
Peng, Xue-Lin
机构
[1] Cent S Univ, Dept Civil Engn, Changsha 410075, Hunan Province, Peoples R China
[2] Fuzhou Univ, Dept Civil Engn, Fuzhou 350002, Fujian Province, Peoples R China
关键词
bridges; cable-stayed; load tests; bridge tests; finite element method; structural safety; China; monitoring;
D O I
10.1061/(ASCE)1084-0702(2007)12:2(261)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A field load test is an essential way to understand the behavior and fundamental characteristics of newly constructed bridges before they are allowed to go into service. The results of field static load tests and numerical analyses on the Qingzhou cable-stayed bridge (605 m central span length) over the Ming River, in Fuzhou, China are presented in the paper. The general test plan, tasks, and the responses measured are described. The level of test loading is about 80-95% of the code-specified serviceability load. The measured results include the deck profile, deck and tower displacements, and stresses of steel-concrete composite deck. A full three-dimensional finite-element model is developed and calibrated to match the measured elevations of the bridge deck. A good agreement is achieved between the experimental and analytical results. It is demonstrated that the initial equilibrium configuration of the bridge plays an important role in the finite-element calculations. Both experimental and analytical results have shown that the bridge is in the elastic state under the planned test loads, which indicates that the bridge has an adequate load-carrying capacity. The calibrated finite-element model that reflects the as-built conditions can be used as a baseline for health monitoring and future maintenance of the bridge.
引用
收藏
页码:261 / 270
页数:10
相关论文
共 20 条
[1]  
ACPA Concrete Information, 1992, DESIGN CONSTRUCTION
[2]   FULLY NONLINEAR-ANALYSIS OF COMPOSITE GIRDER CABLE-STAYED BRIDGES [J].
ADELI, H ;
ZHANG, J .
COMPUTERS & STRUCTURES, 1995, 54 (02) :267-277
[3]  
Amer A., 1999, J BRIDGE ENG, V4, P189, DOI DOI 10.1061/(ASCE)1084-0702(1999)4:3(189)
[4]  
American Association of State Highway and Transportation Officials (AASHTO), 1996, STAND SPEC HIGHW BRI
[5]  
[Anonymous], J BRIDGE ENG
[6]  
*ANSYS, 1999, US MAN REV 5 6
[7]   BRIDGE TESTING - A SURPRISE EVERY TIME [J].
BAKHT, B ;
JAEGER, LG .
JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1990, 116 (05) :1370-1383
[8]  
BARKER MG, 2001, J BRIDGE ENG, V6, P254
[9]  
Cunha A., 2001, J BRIDGE ENG, V6, P54, DOI DOI 10.1061/(ASCE)1084-0702(2001)6:1(54)
[10]   Field Static Load Test on Kao-Ping-Hsi Cable-Stayed Bridge [J].
Fang, I-Kuang ;
Chen, Chun-Ray ;
Chang, I-Shang .
JOURNAL OF BRIDGE ENGINEERING, 2004, 9 (06) :531-540