Sizing and Sitting of DERs in Active Distribution Networks Incorporating Load Prevailing Uncertainties Using Probabilistic Approaches

被引:37
作者
Nematollahi, Amin Foroughi [1 ]
Shahinzadeh, Hossein [1 ]
Nafisi, Hamed [1 ]
Vahidi, Behrooz [1 ]
Amirat, Yassine [2 ]
Benbouzid, Mohamed [3 ]
机构
[1] Amirkabir Univ Technol, Tehran Polytech, Dept Elect Engn, Tehran 1591634311, Iran
[2] ISEN Yncrea Ouest, L bISEN, Brest Campus,20 Rue Cuirasse Bretagne, F-29200 Brest, France
[3] Univ Brest, Inst Rech Dupuy de Lome, IRDL, CNRS,UMR 6027, F-29238 Brest, France
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 09期
关键词
microgrid; optimization; lightning attachment procedure optimization (LAPO) algorithm; photovoltaic panel; uncertainty; PARTICLE SWARM OPTIMIZATION; REACTIVE POWER DISPATCH; OPTIMAL DG PLACEMENT; ENERGY-STORAGE; OPTIMAL ALLOCATION; SYSTEM; UNITS; GENERATORS; ALGORITHM; RELIABILITY;
D O I
10.3390/app11094156
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In this study, a microgrid scheme encompassing photovoltaic panels, an energy storage system, and a diesel generator as a backup supply source is designed, and the optimal placement for installation is suggested. The main purpose of this microgrid is to meet the intrinsic demand without being supplied by the upstream network. Thus, the main objective in the design of the microgrid is to minimize the operational cost of microgrid's sources subject to satisfy the loads by these sources. Therefore, the considered problem in this study is to determine the optimal size and placement for generation sources simultaneously for a microgrid with the objectives of minimization of cost of generation resources along with mitigation of power losses. In order to deal with uncertainties of PV generation and load forecasting, the lognormal distribution model and Gaussian process quantile regression (GPQR) approaches are employed. In order to solve the optimization problem, the lightning attachment procedure optimization (LAPO) and artificial bee colony (ABC) methods are employed, and the results are compared. The results imply the more effectiveness and priority of the LAPO approach in comparison with ABC in convergence speed and the accuracy of solution-finding.
引用
收藏
页数:21
相关论文
共 45 条
[1]  
Alotaibi M, 2016, IEEE ELECTR POW ENER
[2]   Minimization of Power Losses through Optimal Battery Placement in a Distributed Network with High Penetration of Photovoltaics [J].
Alzahrani, Ahmed ;
Alharthi, Hussain ;
Khalid, Muhammad .
ENERGIES, 2020, 13 (01)
[3]   A new approach for optimum simultaneous multi-DG distributed generation Units placement and sizing based on maximization of system loadability using HPSO (hybrid particle swarm optimization) algorithm [J].
Aman, M. M. ;
Jasmon, G. B. ;
Bakar, A. H. A. ;
Mokhlis, H. .
ENERGY, 2014, 66 :202-215
[4]   A Multiobjective Particle Swarm Optimization for Sizing and Placement of DGs from DG Owner's and Distribution Company's Viewpoints [J].
Ameli, Amir ;
Bahrami, Shahab ;
Khazaeli, Farid ;
Haghifam, Mahmood-Reza .
IEEE TRANSACTIONS ON POWER DELIVERY, 2014, 29 (04) :1831-1840
[5]   Optimal DG Placement in a Smart Distribution Grid Considering Economic Aspects [J].
Buaklee, Wirote ;
Hongesombut, Komsan .
JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2014, 9 (04) :1240-1247
[6]   Hybrid wind-diesel stand-alone system sizing accounting for component expected life and fuel price uncertainty [J].
Carpentiero, V. ;
Langella, R. ;
Testa, A. .
ELECTRIC POWER SYSTEMS RESEARCH, 2012, 88 :69-77
[7]  
Cho J., 2012, ICEE, V2, P166, DOI DOI 10.5370/JICEE.2012.2.2.166
[8]   Assessing the benefits and economics of bulk energy storage technologies in the power grid [J].
Das, Trishna ;
Krishnan, Venkat ;
McCalley, James D. .
APPLIED ENERGY, 2015, 139 :104-118
[9]  
Ebeed M., UNCERTAIN MODERN POW, V2021, P1
[10]   An Improved Lightning Attachment Procedure Optimizer for Optimal Reactive Power Dispatch With Uncertainty in Renewable Energy Resources [J].
Ebeed, Mohamed ;
Ali, Abdelfatah ;
Mosaad, Mohamed I. ;
Kamel, Salah .
IEEE ACCESS, 2020, 8 :168721-168731