Hydraulic fracturing of hard top coal and roof for controlling gas during the initial mining stages in longwall top coal caving: a case study

被引:22
|
作者
Huang, Bingxiang [1 ]
Cheng, Qingying [2 ]
Zhao, Xinglong [1 ]
Kang, Chao [1 ]
机构
[1] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
[2] China Univ Min & Technol, Sch Safety Engn, Xuzhou 221116, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
gas overrunning; hard top coal and hard roof; initial mining stage; hydraulic fracturing; gas control; SUBCRITICAL CRACK-PROPAGATION; PRESSURE; MINES; OIL;
D O I
10.1088/1742-2140/aad75c
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Due to the poor cavability of top coal, the connection between the high-level gas drainage lane and the gob is not sufficient during the initial mining stage in a extra-thick coal seam with hard roof and hard coal in longwall top coal caving. The gases gathering in the gob area will suddenly release and cause extrusion when the upper roof first collapses and falls, which will result in gas overrunning and affecting the safety production. Based on the propagation law of hydraulic fractures and the cause of gas overrunning, a new technology was put forward to solve the gas overrunning during the initial mining stage in longwall top coal caving operations. A method for designing the drilling hole parameters for hydraulic fracturing was formed. Hydraulic fracturing was carried out in the measure lane to weaken the top coal and roof and induce the mining pressure to break coal; through this the cavability of the top coal and roof could be improved. Simultaneously, the connection between the gob and the high-level gas drainage lane, and the permeability of the coal seam, could be improved; moreover, the gas drainage effect could be enhanced. The field test in the Tashan Coal Mine indicated that the high-level gas drainage lane was completely connected with the gob after hydraulic fracturing when the working face advanced 15 m, and the gas concentration at the upper corner of the working face was maintained at a level of 0.3% during the initial mining stage. Furthermore, the gas overrunning during the initial mining stages was avoided, and safety was guaranteed.
引用
收藏
页码:2492 / 2506
页数:15
相关论文
共 50 条
  • [1] Longwall top coal caving (LTCC) mining technologies with roof softening by hydraulic fracturing method
    Klishin, V.
    Nikitenko, S.
    Opruk, G.
    XI ALL-RUSSIAN SCIENTIFIC AND PRACTICAL CONFERENCE (WITH INTERNATIONAL PARTICIPATION) AUTOMATION SYSTEMS IN EDUCATION, SCIENCE AND PRODUCTION, 2017, 2018, 354
  • [2] Using hydraulic fracturing to control caving of the hanging roof during the initial mining stages in a longwall coal mine: a case study
    Bingxiang Huang
    Qingying Cheng
    Xinglong Zhao
    Weichao Xue
    Malcolm Scoble
    Arabian Journal of Geosciences, 2018, 11
  • [3] Using hydraulic fracturing to control caving of the hanging roof during the initial mining stages in a longwall coal mine: a case study
    Huang, Bingxiang
    Cheng, Qingying
    Zhao, Xinglong
    Xue, Weichao
    Scoble, Malcolm
    ARABIAN JOURNAL OF GEOSCIENCES, 2018, 11 (20)
  • [4] Study of gas permeability in top-coal during mechanical longwall top-coal caving mining
    Cheng, Guo-Ming
    Wu, Jian
    Wang, Si-Jing
    Xiangtan Kuangye Xueyuan Xuebao/Journal of Xiangtan Mining Institute, 2002, 17 (04):
  • [5] Effect of Key Parameters on Top Coal First Caving and Roof First Weighting in Longwall Top Coal Caving: A Case Study
    Le, Tien Dung
    Bui, Xuan Nam
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2020, 20 (05)
  • [6] Longwall Top-Coal Caving Mechanism and Cavability Optimization with Hydraulic Fracturing in Thick Coal Seam: A Case Study
    Wang, Zhaohui
    Tang, Yuesong
    Gong, Hao
    ENERGIES, 2021, 14 (16)
  • [7] Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring
    Yu, Bin
    Zhao, Jun
    Xiao, Hongtian
    ROCK MECHANICS AND ROCK ENGINEERING, 2017, 50 (02) : 507 - 511
  • [8] Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring
    Bin Yu
    Jun Zhao
    Hongtian Xiao
    Rock Mechanics and Rock Engineering, 2017, 50 : 507 - 511
  • [9] Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams
    Huang, Bingxiang
    Wang, Youzhuang
    Cao, Shenggen
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2015, 74 : 45 - 57
  • [10] Study on the influence of coal recovery rate under the mutual effect of top coal and roof in longwall top coal caving
    Tianbai Zhou
    Lingfan Zhang
    Bo Li
    Zuodong Shen
    Arabian Journal of Geosciences, 2022, 15 (4)