Use of Hardware-in-the-Loop (HWIL) testing from early software development through final system test to mitigate risk and to assure mission success for the Hera targets program

被引:0
作者
Marcin, M [1 ]
机构
[1] COLEMAN RES CORP,LAUNCH SYST GRP,ORLANDO,FL 32819
来源
TECHNOLOGIES FOR SYNTHETIC ENVIRONMENTS: HARDWARE-IN-THE-LOOP TESTING | 1996年 / 2741卷
关键词
Hardware-in-the-Loop; HWIL; Computer-in-the-Loop; CIL; real-time simulation; Hera; closed loop test;
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
引用
收藏
页码:409 / 421
页数:13
相关论文
empty
未找到相关数据