共 70 条
- [12] Baker B.N., 1983, PROJ MANAG HDB, V16, P21
- [13] Belassi W., 1996, International Journal of Project Management, V14, P141, DOI [10.1016/0263-7863(95)00064-X, DOI 10.1016/0263-7863(95)00064-X]
- [14] Belout A., 1998, INT J PROJ MANAG, V16, P21, DOI [DOI 10.1016/S0263-7863(97)00011-2, DOI 10.1016/50263-7863(97)00011-2]
- [15] Bryde D. J., 2005, International Journal of Project Management, V23, P622, DOI 10.1016/j.ijproman.2005.05.003
- [16] Chan A. P. C., 2004, Benchmarking, V11, P203, DOI [DOI 10.1108/14635770410532624, 10.1108/14635770410532624]
- [17] Factors affecting the success of a construction project [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 153 - 155
- [18] Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7