Yard Crane Scheduling for container storage, retrieval, and relocation

被引:67
作者
Galle, Virgile [1 ]
Barnhart, Cynthia [1 ,2 ]
Jaillet, Patrick [1 ,3 ]
机构
[1] MIT, Ctr Operat Res, 77 Massachusetts Ave, Cambridge, MA 02139 USA
[2] MIT, Civil & Environm Engn, 77 Massachusetts Ave, Cambridge, MA 02139 USA
[3] MIT, Elect Engn & Comp Sci, 77 Massachusetts Ave, Cambridge, MA 02139 USA
关键词
Combinatorial optimization; OR in maritime industry; Integer programming; Yard Crane Scheduling Problem; Container Relocation Problem; MATHEMATICAL FORMULATION; TERMINALS; ALGORITHMS; BLOCKS; OPERATIONS; MODELS;
D O I
10.1016/j.ejor.2018.05.007
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper introduces a novel optimization problem resulting from the combination of two major existing problems arising at storage yards in container terminals. The Yard Crane Scheduling Problem is typically concerned with routing the crane given a sequence of storage and retrieval requests to perform, while the Container Relocation Problem tackles the minimization of relocations when retrieving containers in a simpler setting. This paper is the first to consider a model that integrates these two problems by scheduling storage, retrieval and relocations requests and deciding on storage and relocation positions. We formulate this problem as an integer program that jointly optimizes current crane travel time and future relocations. Based on the structure of the proposed formulation and the linear programming relaxation of subproblems, we propose a heuristic local search scheme. Finally, we show the value of our solutions on both simulated instances as well as real data from a port terminal. (C) 2018 Elsevier B.V. All rights reserved.
引用
收藏
页码:288 / 316
页数:29
相关论文
共 50 条
  • [41] A column generation approach for the crane scheduling with sidekick in a perpendicular automated yard block
    Jiang, Xin Jia
    Yang, Xiao Ming
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2023, 176
  • [42] Container relocation problem with time windows for container departure
    Ku, Dusan
    Arthanari, Tiru S.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (03) : 1031 - 1039
  • [43] Solving the yard crane scheduling problem with dynamic assignment of input/output points
    Wang, Hongtao
    Villa, Fulgencia
    Vallada, Eva
    Ruiz, Ruben
    COMPUTERS & OPERATIONS RESEARCH, 2025, 173
  • [44] Performance Comparison of Real-Time Yard Crane Dispatching Strategies at Nontransshipment Container Terminals
    Yu, Xuhui
    Tang, Guolei
    Guo, Zijian
    Song, Xiangqun
    Yu, Jingjing
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [45] Efficiency and energy consumption of the automated container yard with twin rail-mounted gantry cranes considering crane scheduling strategies and handshake area designs
    Tang, Guolei
    Li, Mengxin
    Fang, Zhuo
    Shen, Chen
    Qi, Yue
    Zhen, Zhonghan
    Zhao, Zhuoyao
    SIMULATION MODELLING PRACTICE AND THEORY, 2024, 135
  • [46] Queueing networks for supporting container storage and retrieval
    Legato, Pasquale
    Mazza, Rina Mary
    MARITIME BUSINESS REVIEW, 2023, 8 (04) : 301 - 317
  • [47] A mathematical formulation and efficient heuristics for the dynamic container relocation problem
    Akyuz, M. Hakan
    Lee, Chung-Yee
    NAVAL RESEARCH LOGISTICS, 2014, 61 (02) : 101 - 118
  • [48] Integrated Bay Allocation and Yard Crane Scheduling Problem for Transshipment Containers
    Lee, Der-Horng
    Jin, Jian Gang
    Chen, Jiang Hang
    TRANSPORTATION RESEARCH RECORD, 2011, (2222) : 63 - 71
  • [49] YARD CRANE DISPATCHING BASED ON REAL TIME DATA DRIVEN SIMULATION FOR CONTAINER TERMINALS
    Guo, Xi
    Huang, Shell Ying
    Hsu, Wen Jing
    Low, Malcolm Yoke Hean
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 2648 - 2655
  • [50] Levelling crane workload in multi-yard rail-road container terminals
    Schulz, Arne
    Fliedner, Malte
    Fiedrich, Benedikt
    Pfeiffer, Christian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 293 (03) : 941 - 954