Yard Crane Scheduling for container storage, retrieval, and relocation

被引:67
作者
Galle, Virgile [1 ]
Barnhart, Cynthia [1 ,2 ]
Jaillet, Patrick [1 ,3 ]
机构
[1] MIT, Ctr Operat Res, 77 Massachusetts Ave, Cambridge, MA 02139 USA
[2] MIT, Civil & Environm Engn, 77 Massachusetts Ave, Cambridge, MA 02139 USA
[3] MIT, Elect Engn & Comp Sci, 77 Massachusetts Ave, Cambridge, MA 02139 USA
关键词
Combinatorial optimization; OR in maritime industry; Integer programming; Yard Crane Scheduling Problem; Container Relocation Problem; MATHEMATICAL FORMULATION; TERMINALS; ALGORITHMS; BLOCKS; OPERATIONS; MODELS;
D O I
10.1016/j.ejor.2018.05.007
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper introduces a novel optimization problem resulting from the combination of two major existing problems arising at storage yards in container terminals. The Yard Crane Scheduling Problem is typically concerned with routing the crane given a sequence of storage and retrieval requests to perform, while the Container Relocation Problem tackles the minimization of relocations when retrieving containers in a simpler setting. This paper is the first to consider a model that integrates these two problems by scheduling storage, retrieval and relocations requests and deciding on storage and relocation positions. We formulate this problem as an integer program that jointly optimizes current crane travel time and future relocations. Based on the structure of the proposed formulation and the linear programming relaxation of subproblems, we propose a heuristic local search scheme. Finally, we show the value of our solutions on both simulated instances as well as real data from a port terminal. (C) 2018 Elsevier B.V. All rights reserved.
引用
收藏
页码:288 / 316
页数:29
相关论文
共 50 条
  • [31] Integrated quay crane and yard truck scheduling for unloading inbound containers
    Kaveshgar, Narges
    Nathan Huynh
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 159 : 168 - 177
  • [32] Container Relocation and Retrieval Tradeoffs Minimizing Schedule Deviations and Relocations
    Klar, Robert
    Andersson, Anders
    Fredriksson, Anna
    Angelakis, Vangelis
    IEEE OPEN JOURNAL OF INTELLIGENT TRANSPORTATION SYSTEMS, 2024, 5 : 360 - 379
  • [33] Yard Crane Dispatching to Minimize Total Weighted Vessel Turnaround Times in Container Terminals
    Huang, Shell Ying
    Li, Ya
    COMPUTATIONAL LOGISTICS (ICCL 2015), 2015, 9335 : 267 - 280
  • [34] MILP Model and a Rolling Horizon Algorithm for Crane Scheduling in a Hybrid Storage Container Terminal
    Yu, Kai
    Yang, Jingcheng
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2019, 2019
  • [35] Storage yard management in container Transshipment Hubs
    Halim, Koutar
    Dkhil, Hamdi
    McHich, Rachid
    Yassine, Adnan
    2018 4TH IEEE INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT (GOL), 2018,
  • [36] Real-time scheduling for twin RMGs in an automated container yard
    Park, Taejin
    Choe, Ri
    Ok, Seung Min
    Ryu, Kwang Ryel
    OR SPECTRUM, 2010, 32 (03) : 593 - 615
  • [37] Heuristic/Metaheuristic-Based Simulation Optimization Approaches for Integrated Scheduling of Yard Crane, Yard Truck, and Quay Crane Considering Import and Export Containers
    HSU, HSIEN-PIN
    CHOU, CHIEN-CHANG
    WANG, CHIA-NAN
    IEEE ACCESS, 2022, 10 : 64650 - 64670
  • [38] YARD CRANE DISPATCHING TO MINIMIZE VESSEL TURNAROUND TIMES IN CONTAINER TERMINALS
    Huang, Shell Ying
    Li, Ya
    Guo, Xi
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1747 - 1758
  • [39] Crane Scheduling in Container Yards with Differential Evolution
    Xiao Jianmei
    Wang Xihuai
    Xu Jingting
    2011 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE (ICMI 2011), PT 2, 2011, 4 : 580 - 585
  • [40] A crane scheduling method for port container terminals
    Kim, KH
    Park, YM
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) : 752 - 768