Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

被引:86
|
作者
Sovacool, Benjamin K. [1 ,2 ]
Gilbert, Alex [2 ]
Nugent, Daniel [2 ]
机构
[1] Aarhus Univ, AU Herning, DK-7400 Herning, Denmark
[2] Vermont Law Sch, Inst Energy & Environm, South Royalton, VT 05068 USA
关键词
Electric supply networks; Electric utility industry; Construction risk; Regression analysis; Reference class forecasting; POWER-PLANT CONSTRUCTION;
D O I
10.1016/j.energy.2014.07.070
中图分类号
O414.1 [热力学];
学科分类号
摘要
This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:906 / 917
页数:12
相关论文
共 1 条
  • [1] An international comparative assessment of construction cost overruns for electricity infrastructure
    Sovacool, Benjamin K.
    Gilbert, Alex
    Nugent, Daniel
    ENERGY RESEARCH & SOCIAL SCIENCE, 2014, 3 : 152 - 160