共 53 条
[3]
Chan F, 2006, WILEY SER PARA DIST, P1, DOI 10.1002/0471732710.ch1
[4]
INTEGRATED PROCESS PLANNING AND SCHEDULING USING GENETIC ALGORITHMS
[J].
TEHNICKI VJESNIK-TECHNICAL GAZETTE,
2017, 24 (05)
:1401-1409
[6]
Chryssolouris G., 1984, Robotics and Computer- Integrated Manufacturing, V1, P315, DOI DOI 10.1016/0736-5845(84)90020-6
[10]
An effective PSO and AIS-based hybrid intelligent algorithm for job-shop scheduling
[J].
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS,
2008, 38 (02)
:358-368