Creating a flexible, simulation-based finite scheduling tool

被引:15
作者
Mazziotti, BW [1 ]
Horne, RE [1 ]
机构
[1] Text Clothing Technol Corp, Cary, NC 27511 USA
来源
PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE | 1997年
关键词
D O I
10.1145/268437.268665
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Today's business climate for manufacturers requires low inventory, quick response systems that turn out a wide variety of products. Since many companies are reaching physical capacity constraints, finite scheduling is increasingly becoming an issue. If you are currently an engineer with simulation expertise, you may be asked to assist with an initiative to computerize your scheduling process. There are dozens of off-the-shelf scheduling tools available today, but their underlying capabilities may not meet the true needs of your system. This paper will discuss critical system characteristics that are often ignored in off-the-shelf packages yet can be accurately accommodated by creating your own simulation-based scheduler. We will review how to approach modeling and data structure issues that will commonly be encountered, while highlighting the differences from creating a standard simulation model used strictly for analysis.
引用
收藏
页码:853 / 860
页数:8
相关论文
empty
未找到相关数据