Study on the risk assessment of iron ore shipping channel in China

被引:0
|
作者
Xu Guibin [1 ]
Xu, Zhao [1 ]
Tao, Wang [1 ]
机构
[1] Dalian Maritime Univ, Transportat Management Coll, Dalian, Peoples R China
来源
INFORMATION SCIENCE AND MANAGEMENT ENGINEERING, VOLS 1-3 | 2014年 / 46卷
关键词
risk assessment; iron ore; maximum entropy model; shipping channel; risk factors;
D O I
10.2495/ISME20131221
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
As the world's largest steel producer and consumer countries, it is particularly important for China to ensure the supply of raw materials for steel. This paper analyzed the risk for shipping channel of iron ore in China. The risks were mainly affected by five factors and they include the ships scale-up, the stability of import, the domestic carriers share, the terminal traffic capacity, and the force majeure. Then the paper used risk assessment model based on maximum entropy model to study the overall risk of the iron ore shipping channel. The result shows that the risk level was relatively high and conforms to the actual situation. The paper also provides a basis for decision making to the iron ore industry of China.
引用
收藏
页码:951 / 956
页数:6
相关论文
共 50 条
  • [1] Trace element deportment and particle formation behaviour during thermal processing of iron ore: technical reference for risk assessment of iron ore processing
    Kan, Tao
    Strezov, Vladimir
    Evans, Tim J.
    Nelson, Peter F.
    JOURNAL OF CLEANER PRODUCTION, 2015, 102 : 384 - 393
  • [2] Risk Assessment for the Logistics of Shipping Companies: An Exploratory Study
    Liu, Yutong
    Cui, Li
    JOURNAL OF COASTAL RESEARCH, 2020, : 463 - 467
  • [3] A Life Cycle Assessment study of iron ore mining
    Ferreira, Helio
    Praca Leite, Mariangela Garcia
    JOURNAL OF CLEANER PRODUCTION, 2015, 108 : 1081 - 1091
  • [4] A Study of Iron Ore Pricing Mechanism and China's Countermeasure
    Liu, Hong
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM - MANAGEMENT SCIENCES AND ENGINEERING, 2011, : 534 - 540
  • [5] An optimization method for shipping nickel ore with risk and emission considered
    Zhang, Wentao
    Hu, Hanlin
    Fang, Wanwei
    Ji, Mingjun
    OCEAN ENGINEERING, 2025, 319
  • [6] An Approach to Overseas Iron Ore Investment Risk Assessment based on Fuzzy Neural Network
    Guo Li
    Lu Caiwu
    Yang Zhen
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 748 - 752
  • [7] An economy-wide and environmental assessment of an imported supply shortage for iron ore: The case of China
    Jiang, Hong-Dian
    Liu, Yan-xin
    Wang, Hanxu
    Li, Huajiao
    Jiang, Yutong
    ECONOMIC ANALYSIS AND POLICY, 2024, 83 : 606 - 617
  • [8] The Study of Groundwater Environment Pollution Risk Assessment in Lead Zinc Ore
    Li, YunZhen
    Yao, Yuan
    Peng, DaoPing
    Ye, Hong
    ADVANCED RESEARCH ON MATERIAL ENGINEERING, CHEMISTRY AND ENVIRONMENT, 2013, 788 : 307 - +
  • [9] A system analysis of the development strategy of iron ore in China
    Wu, Jinxi
    Yang, Jie
    Ma, Linwei
    Li, Zheng
    Shen, Xuesi
    RESOURCES POLICY, 2016, 48 : 32 - 40
  • [10] Life Cycle Assessment of Iron Ore Sintering Process
    Zong-ping LI
    Xiao-hui FAN
    Gui-ming YANG
    Jin-chao WEI
    Ying SUN
    Min WANG
    Journal of Iron and Steel Research(International), 2015, 22 (06) : 473 - 477