Use of bioreactor landfill for nitrogen removal to enhance methane production through ex situ simultaneous nitrification-denitrification and in situ denitrification

被引:15
|
作者
Sun, Xiaojie [1 ,2 ]
Zhang, Hongxia [1 ,2 ]
Cheng, Zhaowen [1 ]
机构
[1] Guilin Univ Technol, Guangxi Key Lab Environm Pollut Control Them & Te, Guilin 541004, Peoples R China
[2] Guilin Univ Technol, Guangxi Collaborat Innovat Ctr Water Pollut Contr, Guilin 541004, Peoples R China
基金
中国国家自然科学基金;
关键词
Bioreactor landfill for nitrogen removal; Simultaneous nitrification-denitrification; Methane production; NO3--N; ANAEROBIC-AEROBIC PROCESS; AGED REFUSE BIOREACTOR; MUNICIPAL SOLID-WASTE; LEACHATE RECIRCULATION; SCALE; NITRATE; DECOMPOSITION; STABILIZATION; NITRITE; MODEL;
D O I
10.1016/j.wasman.2017.04.020
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
High concentrations of nitrate-nitrogen (NO3--N) derived from ex situ nitrification phase can inhibit methane production during ex situ nitrification and in situ denitrification bioreactor landfill. A combined process comprised of ex situ simultaneous nitrification-denitrification (SND) in an aged refuse bioreactor (ARB) and in situ denitrification in a fresh refuse bioreactor (FRB) was conducted to reduce the negative effect of high concentrations of NO3--N. Ex situ SND can be achieved because NO3--N concentration can be reduced and the removal rate of ammonium-nitrogen (NH4+-N) remains largely unchanged when the ventilation rate of ARB-A2 is controlled. The average NO3--N concentrations of effluent were 470 mg/L in ex situ nitrification ARB-A1 and 186 mg/L in ex situ SND ARB-A2. The average NH4+-N removal rates of ARB-Al and ARB-A2 were 98% and 94%, respectively. Based on the experimental data from week 4 to week 30, it is predicted that NH4+-N concentration in FRB-F1 of the ex situ nitrification and in situ denitrification process would reach 25 mg/L after 63 weeks, and about 40 weeks for the FRB-F2 of ex situ SND and in situ denitrification process. Ex situ SND and in situ denitrification process can improve the methane production of FRB-F2. The lag phase time of methane production for the FRB-F2 was 11 weeks. This phase was significantly shorter than the 15-week phases of FRB-F1 in ex situ nitrification and in situ denitrification process. A seven-week stabilization phase was required to increase methane content from 5% to 50% for FRB-F2. Methane content in FRB-F1 did not reach 50% but reached the 45% peak after 20 weeks. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:97 / 102
页数:6
相关论文
共 50 条
  • [41] Effect of carbon-to-nitrogen ratio on simultaneous nitrification denitrification and phosphorus removal in a microaerobic moving bed biofilm reactor
    Iannacone, Francesca
    Di Capua, Francesco
    Granata, Francesco
    Gargano, Rudy
    Pirozzi, Francesco
    Esposito, Giovanni
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2019, 250
  • [42] Effect of simultaneous nitrification and denitrification on nitrogen removal performance and filamentous microorganism diversity of a full-scale MBR plant
    Insel, Guclu
    Erol, Servet
    Ovez, Suleyman
    BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2014, 37 (11) : 2163 - 2173
  • [43] Simultaneous removal of nitrogen and arsenite by heterotrophic nitrification and aerobic denitrification bacterium Hydrogenophaga sp. H7
    Fan, Xia
    Nie, Li
    Chen, Zhengjun
    Zheng, Yongliang
    Wang, Gejiao
    Shi, Kaixiang
    FRONTIERS IN MICROBIOLOGY, 2023, 13
  • [44] Enhancement of simultaneous partial nitrification anammox and denitrification nitrogen removal and biofilm formation by novel biochar/ nano zerovalent iron modified polyurethane biocarrier for treatment of landfill leachate
    Wu, Lina
    Tian, Yinghao
    Liu, Yufan
    Xu, Jianda
    Wang, Chenxu
    Zhang, Linhao
    He, Mengqi
    Peng, Yongzhen
    CHEMICAL ENGINEERING JOURNAL, 2025, 511
  • [45] Experimental investigation of simultaneous nitrification-denitrification and phosphorus removal in pilot-scale sequencing batch moving bed biofilm reactors (SB-MBBRs)
    Fanta, A. B.
    Saegrov, S.
    Azrague, K.
    Osterhus, S. W.
    WATER RESOURCES AND INDUSTRY, 2024, 31
  • [46] Effects of the carbon/nitrogen (C/N) ratio on a system coupling simultaneous nitrification and denitrification (SND) and denitrifying phosphorus removal (DPR)
    Zhu, Guang-Can
    Lu, Yong-Ze
    Xu, Li-Ran
    ENVIRONMENTAL TECHNOLOGY, 2021, 42 (19) : 3048 - 3054
  • [47] Nitrogen removal in recirculating aquaculture water with high dissolved oxygen conditions using the simultaneous partial nitrification, anammox and denitrification system
    Lu, Jian
    Zhang, Yuxuan
    Wu, Jun
    Wang, Jianhua
    BIORESOURCE TECHNOLOGY, 2020, 305
  • [48] Performance of simultaneous nitrification-denitrification and denitrifying phosphorus and manganese removal by driving a single-stage moving bed biofilm reactor based on manganese redox cycling
    Shao, Sicheng
    Zhong, Jinfeng
    Wang, Chunxiao
    Pan, Dandan
    Wu, Xiangwei
    BIORESOURCE TECHNOLOGY, 2022, 362
  • [49] Ammonia-nitrogen removal from water with gC3N4-rGO-TiO2 Z-scheme system via photocatalytic nitrification-denitrification process
    Li, Houfen
    Cao, Yajie
    Liu, Pengxiao
    Li, Yuzhen
    Zhou, Aijuan
    Ye, Fei
    Xue, Shuai
    Yue, Xiuping
    ENVIRONMENTAL RESEARCH, 2022, 205
  • [50] Enhanced nitrogen removal of the simultaneous partial nitrification, anammox and denitrification (SNAD) biofilm reactor for treating mainstream wastewater under low dissolved oxygen (DO) concentration
    Zheng, Zhaoming
    Huang, Shan
    Bian, Wei
    Liang, Dongbo
    Wang, Xiujie
    Zhang, Kai
    Ma, Xiaoran
    Li, Jun
    BIORESOURCE TECHNOLOGY, 2019, 283 : 213 - 220