Use of bioreactor landfill for nitrogen removal to enhance methane production through ex situ simultaneous nitrification-denitrification and in situ denitrification

被引:15
|
作者
Sun, Xiaojie [1 ,2 ]
Zhang, Hongxia [1 ,2 ]
Cheng, Zhaowen [1 ]
机构
[1] Guilin Univ Technol, Guangxi Key Lab Environm Pollut Control Them & Te, Guilin 541004, Peoples R China
[2] Guilin Univ Technol, Guangxi Collaborat Innovat Ctr Water Pollut Contr, Guilin 541004, Peoples R China
基金
中国国家自然科学基金;
关键词
Bioreactor landfill for nitrogen removal; Simultaneous nitrification-denitrification; Methane production; NO3--N; ANAEROBIC-AEROBIC PROCESS; AGED REFUSE BIOREACTOR; MUNICIPAL SOLID-WASTE; LEACHATE RECIRCULATION; SCALE; NITRATE; DECOMPOSITION; STABILIZATION; NITRITE; MODEL;
D O I
10.1016/j.wasman.2017.04.020
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
High concentrations of nitrate-nitrogen (NO3--N) derived from ex situ nitrification phase can inhibit methane production during ex situ nitrification and in situ denitrification bioreactor landfill. A combined process comprised of ex situ simultaneous nitrification-denitrification (SND) in an aged refuse bioreactor (ARB) and in situ denitrification in a fresh refuse bioreactor (FRB) was conducted to reduce the negative effect of high concentrations of NO3--N. Ex situ SND can be achieved because NO3--N concentration can be reduced and the removal rate of ammonium-nitrogen (NH4+-N) remains largely unchanged when the ventilation rate of ARB-A2 is controlled. The average NO3--N concentrations of effluent were 470 mg/L in ex situ nitrification ARB-A1 and 186 mg/L in ex situ SND ARB-A2. The average NH4+-N removal rates of ARB-Al and ARB-A2 were 98% and 94%, respectively. Based on the experimental data from week 4 to week 30, it is predicted that NH4+-N concentration in FRB-F1 of the ex situ nitrification and in situ denitrification process would reach 25 mg/L after 63 weeks, and about 40 weeks for the FRB-F2 of ex situ SND and in situ denitrification process. Ex situ SND and in situ denitrification process can improve the methane production of FRB-F2. The lag phase time of methane production for the FRB-F2 was 11 weeks. This phase was significantly shorter than the 15-week phases of FRB-F1 in ex situ nitrification and in situ denitrification process. A seven-week stabilization phase was required to increase methane content from 5% to 50% for FRB-F2. Methane content in FRB-F1 did not reach 50% but reached the 45% peak after 20 weeks. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:97 / 102
页数:6
相关论文
共 50 条
  • [31] A novel simultaneous partial nitrification Anammox and denitrification (SNAD) with intermittent aeration for cost-effective nitrogen removal from mature landfill leachate
    Zhang, FangZhai
    Peng, Yongzhen
    Miao, Lei
    Wang, Zhong
    Wang, Shuying
    Li, Baikun
    CHEMICAL ENGINEERING JOURNAL, 2017, 313 : 619 - 628
  • [32] Nitrogen removal and carbon reduction of mature landfill leachate under extremely low dissolved oxygen conditions by simultaneous partial nitrification anammox and denitrification
    Wu, Lina
    Yin, Jian
    Zhang, Yulin
    Luo, Anteng
    Tian, Yinghao
    Liu, Yufan
    Peng, Yongzhen
    BIORESOURCE TECHNOLOGY, 2024, 401
  • [33] Performance of simultaneous carbon and nitrogen removal of high-salinity wastewater in heterotrophic nitrification-aerobic denitrification mode
    Song, Kunnan
    Gao, Yuwei
    Yang, Yangyoujia
    Guo, Bian-Qin
    Wang, Yong-Zhong
    JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2023, 11 (03):
  • [34] Evaluation of nitrogen removal and nitrous oxide turnovers in granule-based simultaneous nitrification and denitrification system
    Chen, Feng
    Liu, Yingrui
    He, Yanying
    Chen, Xueming
    Zhu, Tingting
    Liu, Yiwen
    SCIENCE OF THE TOTAL ENVIRONMENT, 2023, 873
  • [35] Enhanced simultaneous nitrification, denitrification and phosphorus removal through mixed carbon source by aerobic granular sludge
    He, Qiulai
    Song, Jianyang
    Zhang, Wei
    Gao, Shuxian
    Wang, Hongyu
    Yu, Jian
    JOURNAL OF HAZARDOUS MATERIALS, 2020, 382
  • [36] Simultaneous nitrogen removal via heterotrophic nitrification and aerobic denitrification by a novel Lysinibacillus fusiformis B301
    Wu, Shiqi
    Lv, Na
    Zhou, Yu
    Li, Xiufen
    WATER ENVIRONMENT RESEARCH, 2023, 95 (03)
  • [37] Enhanced simultaneous nitrification and denitrification in treating low carbon-to-nitrogen ratio wastewater: Treatment performance and nitrogen removal pathway
    Chai, Hongxiang
    Xiang, Yu
    Chen, Rong
    Shao, Zhiyu
    Gu, Li
    Li, Li
    He, Qiang
    BIORESOURCE TECHNOLOGY, 2019, 280 : 51 - 58
  • [38] Challenges for simultaneous nitrification, denitrification, and phosphorus removal in microbial aggregates: mass transfer limitation and nitrous oxide production
    Meyer, RL
    Zeng, RJX
    Giugliano, V
    Blackall, LL
    FEMS MICROBIOLOGY ECOLOGY, 2005, 52 (03) : 329 - 338
  • [39] Complete nitrogen removal via simultaneous nitrification and denitrification by a novel phosphate accumulating Thauera sp. strain SND5
    Wang, Qingkun
    He, Jianzhong
    WATER RESEARCH, 2020, 185
  • [40] Evaluation of mainstream nitrogen removal by simultaneous partial nitrification, anammox and denitrification (SNAD) process in a granule-based reactor
    Liu, Tao
    Ma, Bin
    Chen, Xueming
    Ni, Bing-Jie
    Peng, Yongzhen
    Guo, Jianhua
    CHEMICAL ENGINEERING JOURNAL, 2017, 327 : 973 - 981