Use of bioreactor landfill for nitrogen removal to enhance methane production through ex situ simultaneous nitrification-denitrification and in situ denitrification

被引:15
|
作者
Sun, Xiaojie [1 ,2 ]
Zhang, Hongxia [1 ,2 ]
Cheng, Zhaowen [1 ]
机构
[1] Guilin Univ Technol, Guangxi Key Lab Environm Pollut Control Them & Te, Guilin 541004, Peoples R China
[2] Guilin Univ Technol, Guangxi Collaborat Innovat Ctr Water Pollut Contr, Guilin 541004, Peoples R China
基金
中国国家自然科学基金;
关键词
Bioreactor landfill for nitrogen removal; Simultaneous nitrification-denitrification; Methane production; NO3--N; ANAEROBIC-AEROBIC PROCESS; AGED REFUSE BIOREACTOR; MUNICIPAL SOLID-WASTE; LEACHATE RECIRCULATION; SCALE; NITRATE; DECOMPOSITION; STABILIZATION; NITRITE; MODEL;
D O I
10.1016/j.wasman.2017.04.020
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
High concentrations of nitrate-nitrogen (NO3--N) derived from ex situ nitrification phase can inhibit methane production during ex situ nitrification and in situ denitrification bioreactor landfill. A combined process comprised of ex situ simultaneous nitrification-denitrification (SND) in an aged refuse bioreactor (ARB) and in situ denitrification in a fresh refuse bioreactor (FRB) was conducted to reduce the negative effect of high concentrations of NO3--N. Ex situ SND can be achieved because NO3--N concentration can be reduced and the removal rate of ammonium-nitrogen (NH4+-N) remains largely unchanged when the ventilation rate of ARB-A2 is controlled. The average NO3--N concentrations of effluent were 470 mg/L in ex situ nitrification ARB-A1 and 186 mg/L in ex situ SND ARB-A2. The average NH4+-N removal rates of ARB-Al and ARB-A2 were 98% and 94%, respectively. Based on the experimental data from week 4 to week 30, it is predicted that NH4+-N concentration in FRB-F1 of the ex situ nitrification and in situ denitrification process would reach 25 mg/L after 63 weeks, and about 40 weeks for the FRB-F2 of ex situ SND and in situ denitrification process. Ex situ SND and in situ denitrification process can improve the methane production of FRB-F2. The lag phase time of methane production for the FRB-F2 was 11 weeks. This phase was significantly shorter than the 15-week phases of FRB-F1 in ex situ nitrification and in situ denitrification process. A seven-week stabilization phase was required to increase methane content from 5% to 50% for FRB-F2. Methane content in FRB-F1 did not reach 50% but reached the 45% peak after 20 weeks. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:97 / 102
页数:6
相关论文
共 50 条
  • [1] Ex situ simultaneous nitrification-denitrification and in situ denitrification process for the treatment of landfill leachates
    Li, Jie
    Wu, Beibei
    Li, Qian
    Zou, Yuzhu
    Cheng, Zhaowen
    Sun, Xiaojie
    Xi, Beidou
    WASTE MANAGEMENT, 2019, 88 : 301 - 308
  • [2] Pilot-scale nitrogen removal from leachate by ex situ nitrification and in situ denitrification in a landfill bioreactor
    Sun, Faqian
    Sun, Bin
    Li, Qian
    Deng, Xiaoya
    Hu, Jian
    Wu, Weixiang
    CHEMOSPHERE, 2014, 101 : 77 - 85
  • [3] Nitrogen removal from recycled landfill leachate by ex situ nitrification and in situ denitrification
    He, P. J.
    Shao, L. M.
    Guo, H. D.
    Li, G. J.
    Lee, D. J.
    WASTE MANAGEMENT, 2006, 26 (08) : 838 - 845
  • [4] Nitrogen removal from landfill leachate via ex situ nitrification and sequential in situ denitrification
    Zhong, Qi
    Li, Daping
    Tao, Yong
    Wang, Xiaomei
    He, Xiaohong
    Zhang, Jie
    Zhang, Jinlian
    Guo, Weiqiang
    Wang, Lan
    WASTE MANAGEMENT, 2009, 29 (04) : 1347 - 1353
  • [5] Nitrogen removal from landfill leachate via ex-situ nitrification and in-situ denitrification in laboratory scale bioreactor
    Kristanto, Gabriel Andari
    Rialdi, Harry
    Gusniani, Irma
    3RD INTERNATIONAL CONFERENCE ON SUSTAINABLE CIVIL ENGINEERING STRUCTURES AND CONSTRUCTION MATERIALS - SUSTAINABLE STRUCTURES FOR FUTURE GENERATIONS, 2017, 171 : 425 - 433
  • [6] Ethinylestradiol removal in a conventional and a simultaneous nitrification-denitrification membrane bioreactor
    Paetkau, M.
    Yang, W.
    Cicek, N.
    WATER SCIENCE AND TECHNOLOGY, 2011, 64 (12) : 2333 - 2337
  • [7] Study on Simultaneous Nitrification-Denitrification in Membrane Bioreactor
    Xin, Lu
    Sun, Kai
    RENEWABLE AND SUSTAINABLE ENERGY, PTS 1-7, 2012, 347-353 : 1878 - +
  • [8] Nitrogen removal by ANAMMOX and simultaneous nitrification-denitrification (SND) processes in a novel single airlift bioreactor
    Asadi, A.
    Zinatizadeh, A. A.
    Van Loosdrecht, M.
    Younesi, H.
    RSC ADVANCES, 2016, 6 (78) : 74367 - 74371
  • [9] Comparison of nitrogen removal and sludge characteristics between a conventional and a simultaneous nitrification-denitrification membrane bioreactor
    Paetkau, M.
    Cicek, N.
    DESALINATION, 2011, 283 : 165 - 168
  • [10] Biological nitrogen removal by shortcut nitrification-denitrification
    Zhongguo Jishui Paishui/China Water & Wastewater, 2000, 16 (02): : 29 - 31