Dynamic routing modeling for flash flood forecast in river system

被引:16
作者
Liu, Wen-Cheng [1 ]
Chen, Wei-Bo [2 ]
Hsu, Ming-Hsi [2 ]
Fu, Jin-Cheng [3 ]
机构
[1] Natl United Univ, Dept Civil & Disaster Prevent Engn, Miaoli 36003, Taiwan
[2] Natl Taiwan Univ, Dept Bioenvironm Syst Engn, Taipei 10617, Taiwan
[3] Natl Sci & Technol Ctr Disaster Reduct, Taipei 23143, Taiwan
关键词
Flood forecasting; Dynamic flood routing; Discharge correction; Water stage correction; Leading time; Dansheui River system; ESTUARINE SYSTEM; SALT INTRUSION; DISCHARGE; NETWORKS; TAIWAN;
D O I
10.1007/s11069-009-9394-z
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
A real-time flood-forecasting method coupled with the one-dimensional unsteady flow model was developed for the Danshuei River system in northern Taiwan. Based on the flow at current time, the flow at new time is calculated to provide the water stage forecasting during typhoons. Data, from two typhoons in 2000: Bilis and Nari, were used to validate and evaluate the model capability. First, the developed model was applied to validate and evaluate with and without discharge corrections at the Hsin-Hai Bridge in Tahan Stream, Chung-Cheng Bridge in Hsintien Stream, and Sir-Ho Bridge in the Keelung River. The results indicate that the calculated water stage profiles approach the observed data. Moreover, the water stage forecasting hydrograph with discharge correction is close to the observed water stage hydrograph and yields a better prediction than that without discharge correction. The model was then used to quantify the difference in prediction between different methods of real-time water stage correction. The model results reveal that water stages using the 1-6 h forecast with real-time stage correction exhibits the best lead times. The accuracy for 1-3 h lead time is higher than that for 4-6 h lead time, suggesting that the flash flood forecast in the river system is reasonably accurate for 1-3 h lead time only. The method developed is effective for flash flood forecasting and can be adopted for flood forecasting in complicated river systems.
引用
收藏
页码:519 / 537
页数:19
相关论文
共 28 条
[1]   HYDRAULIC DESIGN OF 2-STAGE CHANNELS [J].
ACKERS, P .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MARITIME AND ENERGY, 1992, 96 (04) :247-257
[2]  
Amein M., 1970, Journal of Hydraulic Engineering, V96, P2481, DOI 10.1061/JYCEAJ.0002796
[3]  
[Anonymous], 4 INT C HYDR CED RAP
[4]  
[Anonymous], 1992, 38 WMO
[5]   Neural networks as routine for error updating of numerical models [J].
Babovic, V ;
Canizares, R ;
Jensen, HR ;
Klinting, A .
JOURNAL OF HYDRAULIC ENGINEERING, 2001, 127 (03) :181-193
[6]  
HARTNACK J, 2001, P 4 DHI SOFTW C DENM
[7]  
HSU MH, 2000, HYDR 2000 C U IOW IO
[8]   Dynamic routing model with real-time roughness updating for flood forecasting [J].
Hsu, Ming-Hsi ;
Fu, Jin-Cheng ;
Liu, Wen-Cheng .
JOURNAL OF HYDRAULIC ENGINEERING, 2006, 132 (06) :605-619
[9]   Flood forecasting and flood warning in the Firth of Clyde, UK [J].
Kaya, Y ;
Stewart, M ;
Becker, M .
NATURAL HAZARDS, 2005, 36 (1-2) :257-271
[10]   Genetic programming and its application in real-time runoff forecasting [J].
Khu, ST ;
Liong, SY ;
Babovic, V ;
Madsen, H ;
Muttil, N .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2001, 37 (02) :439-451