An integrated vendor-buyer inventory model with quality improvement and lead time reduction

被引:101
|
作者
Ouyang, Liang-Yuh [1 ]
Wu, Kun-Shan
Ho, Chia-Huei
机构
[1] Tamkang Univ, Dept Management Sci & Decis Making, Tamsui 251, Taiwan
[2] Tamkang Univ, Dept Business Adm, Tamsui 251, Taiwan
[3] Ming Chuan Univ, Dept Comp Sci & Informat Engn, Tao Yuan 333, Taiwan
关键词
integrated inventory model; quality improvement; lead time reduction; partial backorders;
D O I
10.1016/j.ijpe.2006.12.019
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The success of the Japanese in the employment of just-in-time (JIT) production has received a great deal of attention in the past two decades. The underlying goal of JIT is to eliminate wastes, which can be achieved through various efforts such as shortening lead time and improving quality. Recently, Yang and Pan [2004. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research 42(5), 853-863] have studied the effects of lead time reduction and quality improvement investment on an integrated inventory model. The objective of this study is to extend Yang and Pan's (2004) model by allowing for shortages and using the reorder point as a decision variable. That is, this article develops an integrated inventory model which jointly determines the optimal order quantity, reorder point, process quality, lead time and the frequency of deliveries simultaneously. Analytical results that characterize the exact, optimal policy for the problem described above are devised to develop efficient and optimal computational procedures. Furthermore, a numerical example is given to illustrate the results. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:349 / 358
页数:10
相关论文
共 50 条