Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction

被引:24
作者
Chan, Daniel W. M. [1 ]
Chan, Albert P. C. [1 ]
Lam, Patrick T. I. [1 ]
Wong, James M. W.
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
关键词
Guaranteed maximum price; Target cost contracting; Pitfalls; Risks; Difficulties; Hong Kong;
D O I
10.1061/(ASCE)CO.1943-7862.0000153
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Over the past few decades, both the guaranteed maximum price (GMP) and target cost contracting (TCC) arrangements have been regarded as alternative integrated procurement strategies for clients to mitigate risks, minimize claims, integrate the diverse interests of a complex construction project, and offer incentives to provide value-added services. However, the adoption of GMP/TCC contracts may also generate significant risks and difficulties that merit considerable attention. This paper aims to provide a concise review of the potential pitfalls of the GMP/TCC scheme in general and identifies the key risk factors and potential difficulties associated with GMP/TCC in comparison with other procurement strategies in construction in particular via an empirical survey of clients, contractors, and consultants in Hong Kong. The survey data gleaned from 45 valid replies were analyzed using the mean score ranking technique, Kendall's concordance test, and Spearman's rank correlation test. The survey results indicated that "involvement of inexperienced or claim-conscious contractors in a project procured by a GMP/TCC contract" was considered to be the most significant risk factor; while "design development must keep pace with main contractor's program for tendering the domestic subcontractors' works packages" as the major difficulty in implementing GMP/TCC projects. The research findings derived from this study are particularly essential in assisting the contracting parties to mitigate the detriments brought about by potential risks or difficulties when embarking on GMP/TCC contracts. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to GMP/TCC success for future construction projects.
引用
收藏
页码:495 / 507
页数:13
相关论文
共 40 条
  • [1] Albright S.C., 2006, Data analysis and decision making, V3rd
  • [2] [Anonymous], CONSTR EXC
  • [3] Broome J., 1995, ENG CONSTR ARCHIT MA, V2, P271
  • [4] Broome J., 2002, INT J PROJ MANAG, V20, P59, DOI DOI 10.1016/S0263-7863(00)00035-1
  • [5] Cantirino J., 2003, J CORPORATE REAL EST, V5, P169
  • [6] CONSTRUCTION
    CARTY, GJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03): : 319 - 328
  • [7] CHAN APC, 2002, ANAL PROJECT PARTNER
  • [8] Evaluating Guaranteed Maximum Price and Target Cost Contracting Strategies in Hong Kong Construction Industry
    Chan, Daniel
    Chan, Albert
    Lam, Patrick
    Lam, Edmond
    Wong, James
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2007, 12 (03) : 139 - +
  • [9] Chan DWM, 2008, PROCEEDINGS OF CRIOCM 2008 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCES OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, P285
  • [10] An evaluation of construction time performance in the building industry
    Chan, DWM
    Kumaraswamy, MM
    [J]. BUILDING AND ENVIRONMENT, 1996, 31 (06) : 569 - 578