Lead time considerations for the multi-level capacitated lot-sizing problem

被引:36
作者
Almeder, Christian [1 ]
Klabjan, Diego [2 ]
Traxler, Renate [1 ]
Almada-Lobo, Bernardo [3 ]
机构
[1] European Univ Viadrina Frankfurt Oder, Chair Supply Chain Management, D-15230 Frankfurt, Oder, Germany
[2] Northwestern Univ, Dept Ind Engn & Management Sci, Evanston, IL 60208 USA
[3] Univ Porto, Fac Engn, INESC TEC, P-4200465 Oporto, Portugal
关键词
Production; Lot-sizing; Scheduling; Mixed integer programming; Synchronization; SEQUENCE-DEPENDENT SETUP; SCHEDULING PROBLEM; LOTSIZING PROBLEM; RESOURCE; COSTS; EXTENSIONS; COMPLEXITY; ALGORITHM;
D O I
10.1016/j.ejor.2014.09.030
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We tackle this issue by explicitly modeling these two aspects and the synchronization of batches of products in the multi-level lot-sizing and scheduling formulation. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach in delivering more realistic results. The generated production plans are always feasible and cost savings of 30-40 percent compared to classical models are observed. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:727 / 738
页数:12
相关论文
共 35 条
[11]   Lot sizing and scheduling: industrial extensions and research opportunities [J].
Clark, Alistair ;
Almada-Lobo, Bernardo ;
Almeder, Christian .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) :2457-2461
[12]   THE APPLICATION OF VALID INEQUALITIES TO THE MULTISTAGE LOT-SIZING PROBLEM [J].
CLARK, AR ;
ARMENTANO, VA .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (07) :669-680
[13]   Lot sizing and scheduling - Survey and extensions [J].
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (02) :221-235
[14]   Simultaneous lot sizing and scheduling for multi-product multi-level production [J].
Fandel, Guenter ;
Stammen-Hegene, Cathrin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 104 (02) :308-316
[15]  
Gomez Urrutia E. D., 2012, 9 INT C MOD OPT SIM
[16]   The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times [J].
Gupta, D ;
Magnusson, T .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (04) :727-747
[17]   Capacitated lot-sizing with sequence dependent setup costs [J].
Haase, K .
OR SPEKTRUM, 1996, 18 (01) :51-59
[18]   Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach [J].
Karimi-Nasab, M. ;
Seyedhoseini, S. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 231 (03) :598-616
[19]   MULTILEVEL CAPACITATED LOTSIZING COMPLEXITY AND LP-BASED HEURISTICS [J].
MAES, J ;
MCCLAIN, JO ;
VANWASSENHOVE, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 53 (02) :131-148
[20]  
Meyr H., 2004, Z BETRIEBSWIRT, V74, P585