Tool capacity planning in semiconductor manufacturing

被引:49
|
作者
Çatay, B [1 ]
Erengüç, SS
Vakharia, AJ
机构
[1] Sabanci Univ, Fac Engn & Nat Sci, TR-81474 Istanbul, Turkey
[2] Univ Florida, Warrington Coll Business, Dept Informat & Decis Sci, Gainesville, FL 32611 USA
关键词
production planning; semiconductor manufacturing; capacity planning; mathematical programming; Lagrangean relaxation;
D O I
10.1016/S0305-0548(02)00075-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The demand for distinct wafer types in semiconductor manufacturing is an explicit function of the electronic components in which these wafers are used. Given that the component demands vary not only by the product type but also over time, it is obvious that wafer demands are also lumpy and time varying. In this paper, we discuss strategic level investment decisions on procuring new equipment and aggregate level capacity planning. In this context, we examine the problem of planning wafer production over multiple time periods within a single facility assuming that a demand forecast for each wafer type for each period is known. To address this problem, we develop a multi-period mixed-integer programming model to minimize the machine tool operating costs, new tool acquizition costs, and inventory holding costs. Given that production of wafers requires a large number of operations with multiple tools capable of performing each operation, tool operating costs are explicitly minimized by integrating the assignment of specific operations to tools in our model. Since our model is computationally intractable, we propose a Lagrangean-based relaxation heuristic to find efficient tool procurement plans.
引用
收藏
页码:1349 / 1366
页数:18
相关论文
共 50 条
  • [41] Coordinating strategic capacity planning in the semiconductor industry
    Karabuk, S
    Wu, SD
    OPERATIONS RESEARCH, 2003, 51 (06) : 839 - 849
  • [42] Evaluation of capacity planning practices for the semiconductor industry
    Çakanyildirim, M
    Roundy, RO
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2002, 15 (03) : 331 - 340
  • [43] Role of manufacturing lead time in capacity planning
    Pandey, PC
    Hasin, MAA
    INTERNATIONAL JOURNAL OF MATERIALS & PRODUCT TECHNOLOGY, 1996, 11 (5-6): : 438 - 450
  • [44] Capacity Planning for Continuous Pharmaceutical Manufacturing Facilities
    Sundaramoorthy, Arul
    Li, Xiang
    Evans, James M. B.
    Barton, Paul I.
    11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 : 1135 - 1139
  • [45] Capacity Planning in Networks of Queues with Manufacturing Applications
    Bretthauer, K. M.
    Mathematical and Computer Modelling (Oxford), 21 (12):
  • [46] CAPACITY AND FLEXIBILITY PLANNING OF AN ECONOMICAL MANUFACTURING SYSTEM
    TANG, CS
    JOURNAL OF INTELLIGENT MANUFACTURING, 1991, 2 (02) : 75 - 82
  • [47] CAPACITY PLANNING IN NETWORKS OF QUEUES WITH MANUFACTURING APPLICATIONS
    BRETTHAUER, KM
    MATHEMATICAL AND COMPUTER MODELLING, 1995, 21 (12) : 35 - 46
  • [48] Using static capacity modeling techniques in semiconductor manufacturing
    Witte, JD
    1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 31 - 35
  • [49] A capacity evaluation and trading model for semiconductor foundry manufacturing
    Chiang, Ai-Hsuan
    Chou, Yon-Chun
    Chen, Wun-Hwa
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4): : 1 - 10
  • [50] Tool planning models for flexible manufacturing systems
    Mohamed, ZM
    Bernardo, JJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (03) : 497 - 514