Modern heuristic techniques for scheduling generator maintenance in power systems

被引:10
作者
Dahal, KP [1 ]
McDonald, JR [1 ]
Burt, GM [1 ]
机构
[1] Univ Strathclyde, Dept Elect & Elect Engn, Ctr Elect Power Engn, Glasgow G1 1XW, Lanark, Scotland
关键词
generator maintenance scheduling; genetic algorithm; power systems; simulated annealing;
D O I
10.1177/014233120002200204
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper considers the problem of generator maintenance scheduling (GMS) in power systems. The applications of computer-based modern heuristic solutions, namely simulated annealing (SA) and genetic algorithm (GA), are proposed in order to overcome some of the limitations of conventional solution methods. A test problem is formulated as an integer programming problem using a reliability-based objective function and typical problem constraints. The implementation and performance of the solution techniques are discussed. The results obtained demonstrate that these techniques are effective methods for solving GMS problems.
引用
收藏
页码:179 / 194
页数:16
相关论文
共 14 条
[1]  
BURKE KB, 1998, ARTIFICIAL NEURAL NE, P265
[2]   Generator maintenance scheduling using a genetic algorithm with a fuzzy evaluation function [J].
Dahal, KP ;
Aldridge, CJ ;
McDonald, JR .
FUZZY SETS AND SYSTEMS, 1999, 102 (01) :21-29
[3]  
DAHAL KP, 1997, IEE C PUBLICATION, V446, P456
[4]   OPTIMAL GENERATOR MAINTENANCE SCHEDULING USING INTEGER PROGRAMMING [J].
DOPAZO, JF ;
MERRILL, HM .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, 94 (05) :1537-1545
[5]  
Downsland KA, 1993, MODERN HEURISTIC TEC, P20
[6]   EXPERIMENTAL-METHOD OF DETERMINATION OF OPTIMAL MAINTENANCE SCHEDULES IN POWER-SYSTEMS USING BRANCH-AND-BOUND TECHNIQUE [J].
EGAN, GT ;
DILLON, TS ;
MORSZTYN, K .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1976, 6 (08) :538-547
[7]   A METHOD FOR MAINTENANCE SCHEDULING USING GA COMBINED WITH SA [J].
KIM, H ;
NARA, K ;
GEN, M .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) :477-480
[8]   Evolutionary computation in power systems [J].
Miranda, V ;
Srinivasan, D ;
Proenca, LM .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1998, 20 (02) :89-98
[9]  
QUADSTONE R, 1997, REPROD PLAN LANGUAGE
[10]  
Reeves C.R., 1993, Modern Heuristic Techniques for Combinatorial Problems, P151