Non-government Organizations, Villagers, Political Culture and the Lower Sesan 2 Dam in Northeastern Cambodia

被引:38
作者
Baird, Ian G. [1 ]
机构
[1] Univ Wisconsin, Dept Geog, 550 North Pk St, Madison, WI 53706 USA
关键词
hydropower; dam; non-government organization; northeastern Cambodia; representation; NEOLIBERALISING NATURE; RIVER-BASIN; WORLD-BANK; CONSERVATION; LAOS; ENVIRONMENTALISM; BIODIVERSITY; HYDROPOWER; PEOPLE; FOREST;
D O I
10.1080/14672715.2016.1157958
中图分类号
K9 [地理];
学科分类号
0705 ;
摘要
The Lower Sesan 2 (LS2) Hydropower Project in northeastern Cambodia is presently under construction. As the largest dam to ever be built in Cambodia, it is expected to cause serious and widespread environmental and social impacts. This article analyzes, on the one hand, the relationships between Cambodian non-government organizations (NGOs) and villagers who will be negatively impacted by LS2, and on the other, NGO relations with the Cambodian state. While development actors frequently attempt to construct particular narratives in order to control development trajectories, this research demonstrates that such attempts can meet with serious resistance from local people, even when facing powerful opponents, including in this case NGOs that prefer to advocate for better resettlement and compensation conditions rather than for the cancellation of projects. Focusing on interactions, positioning, local agency, and the particular political culture of Cambodia, this article highlights the importance of particular types of patronage relations in Cambodia between NGOs and villagers, NGOs and the state, and associated territorialization.
引用
收藏
页码:257 / 277
页数:21
相关论文
共 86 条
[1]  
3SPN, 2007, AB VILL SES RIV RAT
[2]  
[Anonymous], 2012, 100S PROT DAM PLANS
[3]  
[Anonymous], WATERSHED
[4]  
[Anonymous], 2002, COMMUNITY BASED STUD
[5]  
[Anonymous], 2005, SESAN RIVER FISHERIE
[6]  
[Anonymous], 2000, Dams and Development: A New Framework for Decision-Making
[7]   The People and their River, the World Bank and its Dam: Revisiting the Xe Bang Fai River in Laos [J].
Baird, Ian G. ;
Shoemaker, Bruce P. ;
Manorom, Kanokwan .
DEVELOPMENT AND CHANGE, 2015, 46 (05) :1080-1105
[8]   Different views of history: Shades of irredentism along the Laos-Cambodia border [J].
Baird, Ian G. .
JOURNAL OF SOUTHEAST ASIAN STUDIES, 2010, 41 (02) :187-213
[9]  
Baird IanG., 2009, Best Practices in Compensation and Resettlement for Large Dams: The Case of the Planned Lower Sesan 2 Hydropower Project in Northeastern Cambodia
[10]   Neoliberalizing nature? Market environmentalism in water supply in England and Wales [J].
Bakker, K .
ANNALS OF THE ASSOCIATION OF AMERICAN GEOGRAPHERS, 2005, 95 (03) :542-565