A steam turbine dynamic model for full scope power plant simulators

被引:16
作者
Celis, Cesar [1 ]
Pinto, Gustavo R. S. [1 ]
Teixeira, Tairo [1 ]
Xavier, Erica [2 ]
机构
[1] GT2 Energia, R Helio de Almeida,S-N,Sala 38,Cidade Univ UFRJ, BR-21941614 Rio De Janeiro, Brazil
[2] Fundacao Getulio Vargas, Rua Praia Botafogo 190, BR-22250900 Rio De Janeiro, Brazil
关键词
Power plants; Steam turbines; Dynamic modeling; Full scope simulators; TRANSIENT OPERATION; GENERATOR; BEHAVIOR; DESIGN; SYSTEM;
D O I
10.1016/j.applthermaleng.2017.03.131
中图分类号
O414.1 [热力学];
学科分类号
摘要
The development of a steam turbine dynamic model for full scope power plant simulators is described in this work. Model completeness is one of the main features of the model developed as it attempts to completely cover the operating envelope of steam turbines. For modeling purposes, distinct regions within the safe operating envelope of steam turbines are discriminated. Accordingly, the corresponding model formulation associated with each of the steam turbine-related operation modes accounted for is detailed. A particular emphasis is put on thermal and rotational inertia effects that are important during start up and shut down of steam turbines. The developed steam turbine dynamic model is utilized for simulating a 300 MW class steam turbine belonging to an existing combined cycle power plant. Comparisons between results obtained from such simulations and those characterizing the equipment actual operation are discussed. The agreement between model results and operating data is in general good, as in average the corresponding discrepancies are of the order of 2% or less. The outcomes from this work suggest that producing high fidelity results from steam turbine dynamic models requires accounting for a number of physical phenomena, primarily, those related to heat transfer processes. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:593 / 602
页数:10
相关论文
共 46 条
[1]   Modeling and investigation start-up procedures of a combined cycle power plant [J].
Alobaid, Falah ;
Postler, Ralf ;
Stroehle, Jochen ;
Epple, Bernd ;
Kim Hyun-Gee .
APPLIED ENERGY, 2008, 85 (12) :1173-1189
[2]   Progress in dynamic simulation of thermal power plants [J].
Alobaid, Falah ;
Mertens, Nicolas ;
Starkloff, Ralf ;
Lanz, Thomas ;
Heinze, Christian ;
Epple, Bernd .
PROGRESS IN ENERGY AND COMBUSTION SCIENCE, 2017, 59 :79-162
[3]   Numerical and experimental study of a heat recovery steam generator during start-up procedure [J].
Alobaid, Falah ;
Karner, Karl ;
Belz, Joerg ;
Epple, Bernd ;
Kim, Hyun-Gee .
ENERGY, 2014, 64 :1057-1070
[4]   Fast start-up analyses for Benson heat recovery steam generator [J].
Alobaid, Falah ;
Pfeiffer, Stefan ;
Epple, Bernd ;
Seon, Chil-Yeong ;
Kim, Hyun-Gee .
ENERGY, 2012, 46 (01) :295-309
[5]   Dynamic simulation of a supercritical once-through heat recovery steam generator during load changes and start-up procedures [J].
Alobaid, Falah ;
Stroehle, Jochen ;
Epple, Bernd ;
Kim, Hyun-Gee .
APPLIED ENERGY, 2009, 86 (7-8) :1274-1282
[6]  
[Anonymous], 2013, FLUID MECH THERMODYN
[7]   LTE: A procedure to predict power plants dynamic behaviour and components lifetime reduction during transient operation [J].
Benato, A. ;
Bracco, S. ;
Stoppato, A. ;
Mirandola, A. .
APPLIED ENERGY, 2016, 162 :880-891
[8]   Combined cycle power plants: A comparison between two different dynamic models to evaluate transient behaviour and residual life [J].
Benato, Alberto ;
Stoppato, Anna ;
Bracco, Stefano .
ENERGY CONVERSION AND MANAGEMENT, 2014, 87 :1269-1280
[9]  
Bergman T.L., 2011, Introduction to Heat Transfer, DOI DOI 10.1016/J.APPLTHERMALENG.2011.03.022
[10]   Availability analysis of heat recovery steam generators used in thermal power plants [J].
Carazas, F. J. G. ;
Salazar, C. H. ;
Souza, G. F. M. .
ENERGY, 2011, 36 (06) :3855-3870