A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects

被引:89
作者
Koo, ChoongWan [1 ]
Hong, TaeHoon [1 ]
Hyun, ChangTaek [1 ]
Koo, KyoJin [1 ]
机构
[1] Univ Seoul, Dept Architectural Engn, Seoul, South Korea
关键词
construction costs; housing; regression analysis; Monte Carlo method; neural networks; optimization; NEURAL-NETWORK;
D O I
10.1139/L10-007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Decision-making in the early stage of a project has a significant impact on the project. However, limited and uncertain information on the project and a complex correlation among various factors that affect the project's construction duration and cost, make it difficult to predict and manage the project. Therefore, this study developed a case-based reasoning (CBR)-based hybrid model with which to predict the construction duration and cost of a project in its early stage. One hundred and one cases among multi-family housing projects that were completed between 2000 and 2005 were used. The CBR-based hybrid model developed in this study is the result of integrating the advantages of (i) prediction methodologies, such as case-based reasoning, multiple regression analysis, and artificial neural networks, (ii) the optimization process using a genetic algorithm, and (iii) the probability distribution and the analysis process of outlier using Monte-Carlo simulation. The results of this study are expected to support the owners and managers who are in charge of estimating budget and construction duration in both public and private sectors, in predicting accurately the construction duration and cost at the business planning or early stage of a project.
引用
收藏
页码:739 / 752
页数:14
相关论文
共 21 条
  • [1] [Anonymous], 1997, APPL CASE BASED REAS
  • [2] Predicting cost deviation in reconstruction projects: Artificial neural network versus regression
    Attalla, M
    Hegazy, T
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (04): : 405 - 411
  • [3] Performance measurement in construction
    Bassioni, HA
    Price, ADF
    Hassan, TM
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (02) : 42 - 50
  • [4] *CII, 1998, 13111 CII U TEX
  • [5] *CII, 1998, 133 CII U TEX
  • [6] Determining attribute weights in a CBR model for early cost prediction of structural systems
    Dogan, Sevgi Zeynep
    Arditi, David
    Guenaydin, H. Murat
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (10) : 1092 - 1098
  • [7] DONALD S, 1992, PROFESSIONAL CONSTRU
  • [8] Cost estimation during design step: Parametric method versus case based reasoning method
    Duverlie, P
    Castelain, JM
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1999, 15 (12) : 895 - 906
  • [9] Neural network model for parametric cost estimation of highway projects
    Hegazy, T
    Ayed, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (03): : 210 - 218
  • [10] KIM G, 2004, J ARCHITECTURAL I KO, V20, P93