Contractor Performance Evaluation for the Best Value of Superpave Projects

被引:17
|
作者
Elyamany, Ahmed [1 ]
Abdelrahman, Magdy [1 ]
机构
[1] N Dakota State Univ, Dept Civil Engn, Fargo, ND 58105 USA
关键词
Best value; Procurement; Quality control; Pavement; Contractors; Simulation; Highway construction; Payment;
D O I
10.1061/(ASCE)CO.1943-7862.0000158
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The best-value (BV) procurement process uses other key factors as well as bid price in the evaluation and selection of the best-performing contractor for the job. Contract time, lane rental, warranty, and quality of delivered product are examples of the key factors that indicate the contractor-expected performance. Literature on best value shows a need for analyzing the past performance of the contractor in similar jobs as an indicator of his/her qualification trend. This paper addresses this issue and proposes a methodology to incorporate quality of delivered product in the BV procurement system of asphalt construction. The paper uses past quality control (QC) testing results and utilizes Monte Carlo simulation to estimate the probability that the contractor gets full payment as an indication of qualification trend. The QC data were obtained from the Nebraska Department of Roads for a number of Superpave pavement projects. The results show the possibility of assigning a quality score for the contractor based on the past performance. This paper contributes to the current practice of best value with a new approach of employing QC as part of the selection process.
引用
收藏
页码:606 / 614
页数:9
相关论文
共 50 条
  • [1] Performance of Superpave Projects in Louisiana
    Kabir, Md Sharear
    Icenogle, Patrick
    King, William , Jr.
    Abadie, Christopher
    TRANSPORTATION RESEARCH RECORD, 2011, (2207) : 16 - 24
  • [2] Targeting optimum value in public sector projects through best value-focused contractor selection
    Palaneeswaran, Ekambaram
    Kumaraswamy, Mohan
    Ng, Thomas
    Engineering, Construction and Architectural Management, 2003, 10 (06) : 418 - 431
  • [3] Defining Best Value for Construction Manager/General Contractor Projects: The CMGC Learning Curve
    Gransberg, Douglas D.
    Shane, Jennifer S.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (04)
  • [4] Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System
    Hasnain, Muhammad
    Thaheem, Muhammad Jamaluddin
    Ullah, Fahim
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2018, 16 (6A) : 695 - 714
  • [5] Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System
    Muhammad Hasnain
    Muhammad Jamaluddin Thaheem
    Fahim Ullah
    International Journal of Civil Engineering, 2018, 16 : 695 - 714
  • [6] CONTRACTOR PERFORMANCE EVALUATION
    HOWARD, DC
    JOURNAL OF ACCOUNTANCY, 1964, 117 (04): : 32 - 32
  • [7] SELECTING A CONTRACTOR FOR FAST-TRACK PROJECTS .1. PRINCIPLES OF CONTRACTOR EVALUATION
    MOORE, MJ
    PLANT ENGINEERING, 1985, 39 (12) : 74 - 75
  • [8] Research on Performance Evaluation of IT Projects Based Value Management
    Wang Xindi
    Chen Li
    Sheng Fushen
    PROCEEDINGS OF 2ND CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCE (LISS 2012), VOLS 1 AND 2, 2013,
  • [9] Contractor Liquidity Evaluation Model for Successful Public Housing Projects
    Lee, Jae In
    Lee, Hyun-Soo
    Park, Moonseo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (12)
  • [10] Superpave construction issues and early performance evaluation
    Brown, ER
    Decker, D
    Mallick, RB
    Bukowski, J
    JOURNAL OF THE ASSOCIATION OF ASPHALT PAVING TECHNOLOGY, VOL 68, 1999: ASPHALT PAVING TECHNOLOGY, 1999, 1999, : 613 - 660