Industrial scheduling solution based on flexible heuristics

被引:4
作者
Harjunkoski, Iiro [1 ]
Bauer, Reinhard [1 ]
机构
[1] ABB Corp Res, Wallstadter Str 59, D-68526 Ladenburg, Germany
关键词
Scheduling; Standards; Heuristics; Large; scale problemsa; ENTERPRISE-WIDE OPTIMIZATION; MODELS; CHALLENGES; ALGORITHMS; SYSTEMS; PLANT;
D O I
10.1016/j.compchemeng.2017.02.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a generic heuristic-based scheduling solution. It highlights the flexibility that a simple heuristic method can offer and shows that using the ISA-95 standard it is possible to express the most relevant problem requirements. In order to illustrate the possible benefits, the paper also compares the solution quality of a smaller scale example scheduling problem to a rigorous mixed-integer linear programming (MILP) approach and shows how a heuristic approach scales towards large-size industrial problems. The paper concludes with a discussion of the advantages and disadvantages of both approaches, showing that for certain types of problems, the heuristic approach is fully sufficient, even if it cannot be expected to result in optimal solutions. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:883 / 891
页数:9
相关论文
共 50 条
  • [41] Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects
    Klein, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 127 (03) : 619 - 638
  • [42] Heuristics for periodical batch job scheduling in a MapReduce computing framework
    Li, Xiaoping
    Jiang, Tianze
    Ruiz, Ruben
    INFORMATION SCIENCES, 2016, 326 : 119 - 133
  • [43] Dynamic heuristics for the generalized job-shop scheduling problem
    Ghedjati, Fatima
    Portmann, Marie-Claude
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 2562 - +
  • [44] Heuristics for scheduling data gathering with limited base station memory
    Berlinska, Joanna
    ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) : 149 - 159
  • [45] Realtime scheduling heuristics for just-in-time production in large-scale flexible job shops
    Weng, Wei
    Chen, Junru
    Zheng, Meimei
    Fujimura, Shigeru
    JOURNAL OF MANUFACTURING SYSTEMS, 2022, 63 : 64 - 77
  • [46] Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times
    Ghaith Rabadi
    Reinaldo J. Moraga
    Ameer Al-Salem
    Journal of Intelligent Manufacturing, 2006, 17 : 85 - 97
  • [47] Heuristics for the unrelated parallel machine scheduling problem with setup times
    Rabadi, G
    Moraga, RJ
    Al-Salem, A
    JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (01) : 85 - 97
  • [48] Improved heuristics for the early/tardy scheduling problem with no idle time
    Valente, JMS
    Alves, RAFS
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (03) : 557 - 569
  • [49] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
    Zhong, Shisheng
    Fu, Xuyun
    Lin, Lin
    Wang, Guolei
    MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
  • [50] Automatic Design of Intercell Scheduling Heuristics
    Li, Dongni
    Zhan, Rongxin
    Du, Shaofeng
    Wu, Xuhui
    Wang, Shuai
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (04) : 1907 - 1921