Industrial scheduling solution based on flexible heuristics

被引:4
作者
Harjunkoski, Iiro [1 ]
Bauer, Reinhard [1 ]
机构
[1] ABB Corp Res, Wallstadter Str 59, D-68526 Ladenburg, Germany
关键词
Scheduling; Standards; Heuristics; Large; scale problemsa; ENTERPRISE-WIDE OPTIMIZATION; MODELS; CHALLENGES; ALGORITHMS; SYSTEMS; PLANT;
D O I
10.1016/j.compchemeng.2017.02.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a generic heuristic-based scheduling solution. It highlights the flexibility that a simple heuristic method can offer and shows that using the ISA-95 standard it is possible to express the most relevant problem requirements. In order to illustrate the possible benefits, the paper also compares the solution quality of a smaller scale example scheduling problem to a rigorous mixed-integer linear programming (MILP) approach and shows how a heuristic approach scales towards large-size industrial problems. The paper concludes with a discussion of the advantages and disadvantages of both approaches, showing that for certain types of problems, the heuristic approach is fully sufficient, even if it cannot be expected to result in optimal solutions. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:883 / 891
页数:9
相关论文
共 50 条
  • [21] Dominance-based heuristics for one-machine total cost scheduling problems
    Jouglet, Antoine
    Savourey, David
    Carlier, Jacques
    Baptiste, Philippe
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (03) : 879 - 899
  • [22] NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness
    Fernandez-Viagas, Victor
    Framinan, Jose M.
    COMPUTERS & OPERATIONS RESEARCH, 2015, 60 : 27 - 36
  • [23] Solver Based Heuristics for Rolling Stocks Corrective Maintenance Scheduling
    Ray, Tom
    Bocquillon, Ronan
    T'kindt, Vincent
    PROCEEDING OF THE 7TH INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT, GOL 2024, VOL 2, 2024, 1105 : 271 - 282
  • [24] Scheduling Interrelated Activities Using Insertion-Based Heuristics
    Lin, Jun
    Huang, Weihao
    Qian, Yanjun
    Zhao, Xi
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2018, 65 (01) : 113 - 127
  • [26] Effective constructive heuristics and meta-heuristics for the distributed assembly permutation flowshop scheduling problem
    Pan, Quan-Ke
    Gao, Liang
    Li Xin-Yu
    Jose, Framinan M.
    APPLIED SOFT COMPUTING, 2019, 81
  • [27] Lagrangian heuristics for instructor scheduling in executive development programmes
    Mukherjee, AK
    Gilbert, KC
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (04) : 373 - 382
  • [28] Scheduling Heuristics for Live Video Transcoding on Cloud Edges
    Panagiotis Oikonomou
    Maria G.Koziri
    Nikos Tziritas
    Thanasis Loukopoulos
    XU Cheng-Zhong
    ZTECommunications, 2017, 15 (02) : 35 - 41
  • [29] On the performance of heuristics for broadcast scheduling
    Commander, CW
    Butenko, SI
    Pardalos, PM
    THEORY AND ALGORITHMS FOR COOPERATIVE SYSTEMS, 2004, 4 : 63 - 80
  • [30] Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment
    Daniels, RL
    Hua, SY
    Webster, S
    COMPUTERS & OPERATIONS RESEARCH, 1999, 26 (02) : 143 - 155