Industrial scheduling solution based on flexible heuristics

被引:4
|
作者
Harjunkoski, Iiro [1 ]
Bauer, Reinhard [1 ]
机构
[1] ABB Corp Res, Wallstadter Str 59, D-68526 Ladenburg, Germany
关键词
Scheduling; Standards; Heuristics; Large; scale problemsa; ENTERPRISE-WIDE OPTIMIZATION; MODELS; CHALLENGES; ALGORITHMS; SYSTEMS; PLANT;
D O I
10.1016/j.compchemeng.2017.02.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a generic heuristic-based scheduling solution. It highlights the flexibility that a simple heuristic method can offer and shows that using the ISA-95 standard it is possible to express the most relevant problem requirements. In order to illustrate the possible benefits, the paper also compares the solution quality of a smaller scale example scheduling problem to a rigorous mixed-integer linear programming (MILP) approach and shows how a heuristic approach scales towards large-size industrial problems. The paper concludes with a discussion of the advantages and disadvantages of both approaches, showing that for certain types of problems, the heuristic approach is fully sufficient, even if it cannot be expected to result in optimal solutions. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:883 / 891
页数:9
相关论文
共 50 条
  • [1] Configurable Scheduling Solution using Flexible Heuristics
    Harjunkoski, Iiro
    Bauer, Reinhard
    26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 2361 - 2366
  • [2] Local-search based heuristics for advertisement scheduling
    da Silva, Mauro Roberto Costa
    Schouery, Rafael Crivellari Saliba
    RAIRO-OPERATIONS RESEARCH, 2024, 58 (04) : 3203 - 3231
  • [3] Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutions
    Wang, H
    EXPERT SYSTEMS, 2005, 22 (02) : 78 - 85
  • [4] A Heuristics Based on RA for Two-stage Flexible Flow Shop Scheduling with Head Group Constraint
    Li, Zhantao
    Chen, Qingxin
    Mao, Ning
    ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION II, PTS 1 AND 2, 2012, 102-102 : 783 - 789
  • [5] Evaluating artificial intelligence heuristics for a flexible Kanban system: simultaneous Kanban controlling and scheduling
    Lee, I.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (13) : 2859 - 2873
  • [6] Heuristics and augmented neural networks for task scheduling with non-identical machines
    Agarwal, Anurag
    Colak, Selcuk
    Jacob, Varghese S.
    Pirkul, Hasan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (01) : 296 - 317
  • [7] Heuristics Based on Partial Enumeration for the Unrelated Parallel Processor Scheduling Problem
    E. Mokotoff
    J.L. Jimeno
    Annals of Operations Research, 2002, 117 : 133 - 150
  • [8] Scope for industrial applications of production scheduling models and solution methods
    Harjunkoski, Iiro
    Maravelias, Christos T.
    Bongers, Peter
    Castro, Pedro M.
    Engell, Sebastian
    Grossmann, Ignacio E.
    Hooker, John
    Mendez, Carlos
    Sand, Guido
    Wassick, John
    COMPUTERS & CHEMICAL ENGINEERING, 2014, 62 : 161 - 193
  • [9] Heuristics based on partial enumeration for the unrelated parallel processor scheduling problem
    Mokotoff, E
    Jimeno, JL
    ANNALS OF OPERATIONS RESEARCH, 2002, 117 (1-4) : 133 - 150
  • [10] A comparison of five heuristics for the multiple depot vehicle scheduling problem
    Pepin, Ann-Sophie
    Desaulniers, Guy
    Hertz, Alain
    Huisman, Dennis
    JOURNAL OF SCHEDULING, 2009, 12 (01) : 17 - 30