Experimental Investigation of the Seismic Behavior of Reinforced Concrete Beam to Concrete-Filled Steel Tube Column Connections

被引:0
作者
Hang, Yu [1 ]
Xiong, Zha Xiao [1 ]
机构
[1] Harbin Inst Technol, Shenzhen Grad Sch, Shenzhen 518055, Peoples R China
来源
STEEL CONCRETE COMPOSITE AND HYBRID STRUCTURES | 2009年
关键词
Concrete-filled steel tube; Concrete beam; Lapped connection; Welded connection; Seismic behavior; TUBULAR COLUMN;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to investigate the seismic behavior of three kinds of reinforcement concrete beam to concrete-filled steel tube column connection, a series of cyclic loading tests has been conducted. This paper presented the experimental details and the test results. Eight specimens in four groups with various connection details and axial compression ratios were considered. The reinforcements Of four specimens were welded to the outer ring plate of the Steel tube subjected to two levels of axial load; the reinforcements of another two specimens were lapped on long steel bracket, and the other of two specimens lapped on short steel bracket with end anchorages. Constant axial load and cyclic lateral loading were applied at the top of columns. It was found that the performance of the welded connection have better seismic performance under cyclic loading. However, the lapped connection can still be used in practical project, since the ductility of these connections both satisfies the requirement of seismic design. Furthermore, this new kind of beam to column connection will highly decrease the cost of time and money, and simultaneously has a fairish performance in earthquake. It will be very economical to use the lapped connection even in seismic design areas.
引用
收藏
页码:417 / 424
页数:8
相关论文
共 50 条
[41]   Experimental Evaluation of Steel Beam Bolted to Reinforced Concrete Column Connections [J].
Li, Xian ;
Xiao, Yan .
ADVANCES IN CONCRETE AND STRUCTURES, 2009, 400-402 :311-319
[42]   Experimental behavior of circular concrete-filled steel tube stub columns [J].
Yu, Zhi-wu ;
Ding, Fa-xing ;
Cai, C. S. .
JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2007, 63 (02) :165-174
[43]   Development and testing of precast concrete-filled square steel tube column-to-RC beam connections under cyclic loading [J].
Zhang, Yue ;
Li, Dongsheng .
CONSTRUCTION AND BUILDING MATERIALS, 2021, 280
[44]   Axial Compressive Behavior of Through-Beam Connections between Concrete-Filled Steel Tubular Columns and Reinforced Concrete Beams [J].
Chen, QingJun ;
Cai, Jian ;
Bradford, Mark A. ;
Liu, Xinpei ;
Wu, Yi .
JOURNAL OF STRUCTURAL ENGINEERING, 2015, 141 (10)
[45]   Experimental and numerical study on seismic behavior of partially steel-reinforced concrete beam-to-steel tube column joint [J].
Zhu, Yazhi ;
Wang, Wei ;
Shi, Yi ;
Li, Ming ;
Wang, Shiye ;
Bao, Lianjin ;
Tian, Yunyu .
JOURNAL OF BUILDING ENGINEERING, 2023, 76
[46]   A Simplified method for Concrete-Filled Steel Tube Column Analysis [J].
Pan, Danguang ;
Li, Zheng ;
Tan, Jinpeng ;
Gao, Hongchun .
ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 :537-+
[47]   Research on seismic behavior of steel fiber-reinforced recycled aggregate concrete-filled square steel tube columns [J].
Zhao, Pengtuan ;
Lu, Yiyan ;
Liu, Zhenzhen ;
Huang, Yue .
STRUCTURES, 2025, 76
[48]   Experimental research on seismic behavior of concrete-filled steel tube columns under cyclic axial loading [J].
Shi Q. ;
Cai W. ;
Wang B. .
Jianzhu Jiegou Xuebao/Journal of Building Structures, 2020, 41 (09) :88-97
[49]   Experimental study on seismic behavior of prefabricated concrete-filled circular steel tube composite shear walls [J].
Wu L. ;
Yu F. ;
Guo X. ;
Chen H. ;
Su Y. ;
Ren H. .
Jianzhu Jiegou Xuebao/Journal of Building Structures, 2022, 43 :186-195
[50]   Experimental study on seismic damage behavior of high strength concrete-encased concrete-filled steel tube composite columns [J].
Ke X. ;
Yang L. ;
An J. .
Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (08) :13-19