A generalization for single-machine scheduling with deteriorating jobs to minimize earliness penalties

被引:19
作者
Huang, Xue [1 ]
Wang, Ji-Bo [1 ]
Wang, Xue-Ru [1 ]
机构
[1] Shenyang Inst Aeronaut Engn, Sch Sci, Operat Res & Cybernet Inst, Shenyang 110136, Peoples R China
关键词
Scheduling; Single-machine; Deteriorating jobs; SLK due date; DEPENDENT PROCESSING TIMES; LINEAR DETERIORATION; MAKESPAN;
D O I
10.1007/s00170-009-2242-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider a single-machine scheduling problem with deteriorating jobs in which the due dates are determined by the equal slack (SLK) method. By a deteriorating job, we mean that the job's processing time is an increasing function of its starting time. We model job deterioration as a function that is proportional to a linear function of time. The objective is to minimize the total weighted earliness penalty subject to no tardy jobs. We prove that two special cases of the problem remain polynomially solvable. The first case is the problem with equally weighted monotonous penalty objective function and the other case is the problem with weighted linear penalty objective function.
引用
收藏
页码:1225 / 1230
页数:6
相关论文
共 24 条
[1]  
Alidaee B, 1999, J OPER RES SOC, V50, P711, DOI 10.2307/3010325
[2]   A concise survey of scheduling with time-dependent processing times [J].
Cheng, TCE ;
Ding, Q ;
Lin, BMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :1-13
[3]   Single-machine scheduling with precedence constraints and decreasing start-time dependent processing times [J].
Gao, Wen-Jun ;
Huang, Xue ;
Wang, Ji-Bo .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (1-4) :291-299
[4]  
Graham R. L., 1979, Discrete Optimisation, P287
[5]   NP-hard cases in scheduling deteriorating jobs on dedicated machines [J].
Kononov, A ;
Gawiejnowicz, S .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (06) :708-717
[6]   A note on single-machine makespan problem with general deteriorating function [J].
Lee, Wen-Chiung ;
Wu, Chin-Chia ;
Liu, Han-Chu .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (9-10) :1053-1056
[7]   Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method [J].
Qi, XT ;
Tu, FS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (03) :502-508
[8]   Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration [J].
Shiau, Yau-Ren ;
Lee, Wen-Chiung ;
Wu, Chin-Chia ;
Chang, Chia-Ming .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 34 (7-8) :774-782
[9]   Minimizing the earliness/tardiness costs on parallel machine with learning effects and deteriorating jobs:: a mixed nonlinear integer programming approach [J].
Toksari, M. Duran ;
Guener, Ertan .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 38 (7-8) :801-808
[10]   Single-machine scheduling with simple linear deterioration to minimize earliness penalties [J].
Wang, Dan ;
Wang, Ji-Bo .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (1-4) :285-290