A new approach for rebalancing of U-lines with stochastic task times using ant colony optimisation algorithm

被引:28
作者
Celik, Erkan [1 ]
Kara, Yakup [2 ]
Atasagun, Yakup [2 ]
机构
[1] Yildiz Tech Univ, Dept Ind Engn, Mech Fac, Istanbul, Turkey
[2] Selcuk Univ, Dept Ind Engn, Fac Engn, Konya, Turkey
关键词
ant colony optimisation algorithm; U-lines; stochastic task times; rebalancing; MODEL ASSEMBLY LINES; HEURISTIC ALGORITHM; BALANCING PROBLEM;
D O I
10.1080/00207543.2014.917768
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In real world, line balancing involves existing lines in existing factories and the line typically needs to be rebalanced rather than balanced. Rebalancing of a U-line can be defined as a changeover process from its initial configuration to a new configuration for a while due to the reasons such as demand variations, changes in product design and changes in task times, etc. This study defines U-line rebalancing problem with stochastic task times and proposes a solution procedure based on ant colony optimisation. The objective of the proposed algorithm is to minimise total cost of rebalancing which is the sum of task transposition costs, workstation opening/closing costs and operating costs of workstations for a particular planning horizon. A comprehensive experiment is conducted to generate problem instances and to compare rebalancing costs of U-lines by means of several factors. A total of 6600 rebalancing solutions are obtained and several comparisons are performed.
引用
收藏
页码:7262 / 7275
页数:14
相关论文
共 54 条
[11]  
[Anonymous], 40 INT C COMP IND EN
[12]  
[Anonymous], P ADV SIM TECHN C VI
[13]  
Arcus A.L., 1966, INT J PROD RES, V4, P259
[14]   Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm [J].
Bagher, M. ;
Zandieh, M. ;
Farsijani, H. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4) :271-285
[15]   A taxonomy of line balancing problems and their solution approaches [J].
Battaia, Olga ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 142 (02) :259-277
[16]  
Bautista J., 2002, Lecture notes in Computer Science, V2463, P65, DOI DOI 10.1007/3-540-45724-0_6
[17]   Ant algorithms for a time and space constrained assembly line balancing problem [J].
Bautista, Joaquin ;
Pereira, Jordi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (03) :2016-2032
[18]   Two-sided assembly line balancing using an ant-colony-based heuristic [J].
Baykasoglu, Adil ;
Dereli, Tuerkay .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (5-6) :582-588
[19]   Stochastic U-line balancing using genetic algorithms [J].
Baykasoglu, Adil ;
Ozbakir, Lale .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 32 (1-2) :139-147
[20]  
Baykasoglu A, 2009, MATH COMPUT APPL, V14, P1