共 11 条
[1]
Andersen E., 2002, INT J PROJ MANAG, V20, P601
[2]
Management's perception of key performance indicators for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2003, 129 (02)
:142-151
[3]
ACTION-RESPONSE MODEL AND LOSS OF PRODUCTIVITY IN CONSTRUCTION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1994, 120 (01)
:47-64
[4]
HASSAN HSA, 2001, FRAMEWORK APPL CONCU
[7]
NITITHAMYONG P, 2003, THESIS PURDUE U W LA
[8]
Patton M., 1996, UTILIZATION FOCUSED
[9]
Thomas R. H., 1988, MANUAL CONSTRUCTION
[10]
THOMAS RH, 1986, ANAL METHODS MEASURI