Rock-Breaking Laws of Disc Cutters with Different Height Differences in Hard Rock Strata

被引:11
作者
Lu, Zelin [1 ]
Wang, Xuchun [1 ]
Teng, Hongwei [1 ]
Guan, Xiaoming [1 ]
Song, Chen [2 ]
Fan, Gang [3 ]
机构
[1] Qingdao Univ Technol, Sch Civil Engn, Qingdao 266520, Peoples R China
[2] Qingdao Geol Explorat Inst China Met Geol Bur, Qingdao 266109, Peoples R China
[3] China Construct Third Engn Bur Infrastruct Constru, Wuhan 430064, Peoples R China
基金
中国国家自然科学基金;
关键词
MODEL; WEAR; PREDICTION; SIMULATION; MECHANISM; BEHAVIOR;
D O I
10.1155/2022/2282830
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When shield machine traverses through hard rock mass, disc cutters will be abraded to different degrees. Excessive height difference exists between adjacent disc cutters, which critically affects the rock-breaking efficiency. Relying on a shield section of hard rock mass in Qingdao, the disc cutter abrasions are measured on site, and the reason for low construction efficiency is analysed. Subsequently, the discrete element method is used to study the rock-breaking law under different height differences of disc cutters. The ultimate cutter height difference for rock breaking is obtained. According to this, the cutter adjustment scheme is proposed to reduce the cutter height differences on site. Comparing shield tunnelling parameters before and after the cutter adjustment, it is found that the construction efficiency is significantly improved. The results are of great significance for improving the rock-breaking efficiency and increasing advancing speed of shield in hard rock mass.
引用
收藏
页数:11
相关论文
共 36 条
  • [11] An Experimental Study of Dependence of Optimum TBM Cutter Spacing on Pre-set Penetration Depth in Sandstone Fragmentation
    Han, D. Y.
    Cao, P.
    Liu, J.
    Zhu, J. B.
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2017, 50 (12) : 3209 - 3221
  • [12] Analysis of Ground Settlement Caused by Double-line TBM Tunnelling Under Existing Building
    Hao, Dongxue
    Zhu, Renjun
    Wu, Ke
    Chen, Rong
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (02) : 899 - 911
  • [13] Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test
    Huo, Junzhou
    Wu, Hanyang
    Yang, Jing
    Sun, Wei
    Li, Guangqing
    Sun, Xiaolong
    [J]. JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2015, 29 (08) : 3043 - 3058
  • [14] Tracking of disc cutter wear in TBM tunneling: a case study of Kerman water conveyance tunnel
    Karami, Morteza
    Zare, Shokrollah
    Rostami, Jamal
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (01) : 201 - 219
  • [15] Study of common wear prediction models for hard rock TBM disc cutters and comparison with field observation in Kerman water conveyance tunnel
    Karami, Morteza
    Zare, Shokrollah
    Rostami, Jamal
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (02) : 1467 - 1476
  • [16] Mechanism and numerical analysis of cutting rock and soil by TBM cutting tools
    Li, Guohui
    Wang, Wenjin
    Jing, Zhijuan
    Zuo, Leibin
    Wang, Fubin
    Wei, Zhen
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 81 : 428 - 437
  • [17] Disc cutter wear prediction based on the friction work principle
    Li, Jie
    Huang, Yuanjun
    Zhang, Xin
    Sun, Ye
    Guo, Jingbo
    [J]. TRANSACTIONS OF THE CANADIAN SOCIETY FOR MECHANICAL ENGINEERING, 2021, 45 (03) : 384 - 395
  • [18] Prediction Model for Disc Cutter Wear of Tunnel Boring Machines in Sandy Cobble Strata
    Li, Yitao
    Di, Honggui
    Yao, Qiyu
    Fu, Longlong
    Zhou, Shunhua
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (03) : 1010 - 1019
  • [19] Research on rock breaking mechanism and load characteristics of TBM cutter based on discrete element method
    Ling, Jingxiu
    Cheng, Long
    Tong, Xin
    Wu, Zhihong
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2021, 13 (02)
  • [20] [毛红梅 Mao Hongmei], 2013, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V35, P1627