Design and operating experience with fast acting load shedding scheme in the Entergy System to prevent voltage collapse

被引:0
作者
Kolluri, S [1 ]
Tinnium, K [1 ]
Stephens, M [1 ]
机构
[1] Entergy Serv Inc, New Orleans, LA USA
来源
2000 IEEE POWER ENGINEERING SOCIETY WINTER MEETING - VOLS 1-4, CONFERENCE PROCEEDINGS | 2000年
关键词
voltage collapse; load shedding; contingency analysis; over excitation relay;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The Western Region of the Entergy System is limited in both generation and transmission. Steady State and Dynamic Voltage stability analysis has indicated that the region can be subjected to severe voltage instability followed with possible voltage collapse under certain critical double contingencies. In order to prevent voltage collapse in the region, Entergy developed a fast acting load shedding scheme called VSHED. This scheme utilizes the existing Supervisory Control and Data Acquisition (SCADA) System to perform load shedding without manual intervention. This paper discusses the results of the voltage stability analysis performed to analyze the problem, the design and development of the VSHED scheme, computer implementation and a recent disturbance during which the VSHED scheme operated successfully and saved the Western Region of the Entergy System.
引用
收藏
页码:1489 / 1494
页数:4
相关论文
共 6 条
[1]  
KOLLURI S, 1998, IEEE TUTORIAL V 0713
[2]  
Kundur P., 1994, POWER SYSTEM STABILI
[3]  
MILLER N, 1992, IEEE PES SUMM POW M
[4]   FAST ACTING LOAD SHEDDING [J].
NIRENBERG, SA ;
MCINNIS, DA ;
SPARKS, KD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (02) :873-877
[5]  
SHUH HM, 1992, GEORG I TECHN 46 ANN
[6]  
Taylor C.W., 1992, POWER SYSTEM VOLTAGE