THE INTEGRATED SCHEDULING PROBLEM IN CONTAINER TERMINAL WITH DUAL-CYCLE OPERATION

被引:4
作者
Zhang, Y. [1 ]
Rong, Z. [2 ]
Liu, Z. -X [2 ]
机构
[1] Wuhan Univ Technol, Wuhan 430063, Hubei, Peoples R China
[2] Wuhan Univ Sci & Technol, Wuhan 430081, Hubei, Peoples R China
关键词
Container Operation System; Dual-Cycle Operation; Scheduling; Heuristics; QUAY CRANES; FLOW SHOPS; CLASSIFICATION; ALGORITHM;
D O I
10.2507/IJSIMM13(3)CO12
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper proposes an integrated scheduling problem for dual-cycle operation in container terminal, which can be described as a 3-stage hybrid flow shop problem with multi-job families and no-buffer. The integrated scheduling problem is formulated as a mixed-integer programming model. Due to the computational intractability, a simulation-based heuristic algorithm is developed for problem solution. State transition of yard truck, inventory and quota of quay crane and yard crane are introduced into the heuristic algorithm. Computational experiments and simulation analysis are conducted to evaluate the effectiveness of the proposed heuristic algorithm. The results show that the algorithm presented is very effective for the equipment scheduling of meta-container terminal with dual-cycle operation.
引用
收藏
页码:335 / 347
页数:13
相关论文
共 18 条
  • [1] A novel hybrid algorithm for scheduling steel-making continuous casting production
    Atighehchian, Arezoo
    Bijari, Mehdi
    Tarkesh, Hamed
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (08) : 2450 - 2461
  • [2] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [3] Inventory-based dispatching of automated guided vehicles on container terminals
    Briskorn, Dirk
    Drexl, Andreas
    Hartmann, Soenke
    [J]. OR SPECTRUM, 2006, 28 (04) : 611 - 630
  • [4] A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
    Chen, Lu
    Bostel, Nathalie
    Dejax, Pierre
    Cai, Jianguo
    Xi, Lifeng
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (01) : 40 - 58
  • [5] Integrated scheduling of crane handling and truck transportation in a maritime container terminal
    Chen, Lu
    Langevin, Andre
    Lu, Zhiqiang
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 225 (01) : 142 - 152
  • [6] Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates
    Choi, Hyun-Seon
    Kim, Hyung-Won
    Lee, Dong-Ho
    Yoon, Junggee
    Yun, Chang Yeon
    Chae, Kevin B.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (9-10) : 963 - 973
  • [7] Double-cycling strategies for container ships and their effect on ship loading and unloading operations
    Goodchild, Anne V.
    Daganzo, Carlos F.
    [J]. TRANSPORTATION SCIENCE, 2006, 40 (04) : 473 - 483
  • [8] Container sequencing for quay cranes with internal reshuffles
    Meisel, Frank
    Wichmann, Matthias
    [J]. OR SPECTRUM, 2010, 32 (03) : 569 - 591
  • [9] Solving a Bi-Criteria Hybrid Flowshop Scheduling Problem Occurring in Apparel Manufacturing
    Montoya-Torres, Jairo R.
    Vargas-Nieto, Fabian
    [J]. INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2011, 4 (02) : 42 - 60
  • [10] Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
    Ribas, Imma
    Leisten, Rainer
    Framinan, Jose M.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (08) : 1439 - 1454